Laserfiche WebLink
tom_ J <br />Site Address: <br />F. In -Tank Gauging / SIR Equipment: <br />Date of Testing/Servicing: <br />❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Com fete the followiag checkffst: <br />es ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />es ❑ No* Was accuracy of system product level readings tested? <br />Yes [3No* Was accuracy of system water level readings tested? <br />[2''Y,es I ❑ No* I Were all probes reinstalled properly? <br />Yes 1 ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed, <br />f'emuletr the fnlinwino rharrrHat- <br />Gryes <br />❑ No* <br />For equipment start-up or annual equipmen�t ce� cation, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: C't"3 g.p.h.'; ❑ 0.1 g.p.h.2; ❑ 0.2 g.p.h.2 <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />❑ Yes <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />MOY Yes <br />❑ No* <br />Was the testing apparatus property calibrated? <br />!3 Ves <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flaw if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />ff N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ Yes <br />I9"NIA <br />❑ No* <br />or disconnected? <br />❑ Yes <br />❑,No* <br />d N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />malfunctions or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ Yes <br />❑ No* <br />p'N/A <br />t3 Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section <br />E, <br />below. dewribe ham tanrl ®1 — +;.__ a .* ___--'-- <br />H. Comments:r <br />t. Z2 � <br />-+.,.e.... — c vi w ii[ De currecrem <br />Page 3 -of 3 <br />03/01 <br />