Laserfiche WebLink
NIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54490-546 <br /> 9 1.CONTINUOUS ELECTRONIC MONITORING El 2.FLOAT AND CHAIN ASSEMBLY El 3.ELECTRONIC STAND-ALONE <br /> E] 4.NO DISPENSERS E]99.OTHER(Specify): <br /> PANEL MANUFACTURER: 4ae0&,7_ :;�;6:51 MODEL#: 490-56. <br /> -------------------------- -TL-5 <br /> LEAK SENSOR MANUFACTURER: J a (Z-0'.)r 490-51 MODEL#(S): 'Zl)br 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a.YES El b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN a.YES []b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. in a.YES E-1 b.NO 49061 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. .YES El b.NO 49062 <br /> 2.UDC CONSTRUCTION IS 01.SINGLE-WALLED El 2.DOUBLE-WALLED 490:63 <br /> IF DOUBLE WALLED: 490-648 <br /> UDC INTERSTITIAL SPAC EIS MONITORED BY: [-]-I.-LIQUID El 2.PRESSURE <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES E]b.No 490-641 <br /> VII.PERIODIC SYSTEM TESTING <br /> El 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65, <br /> ---------LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS--- CCR-§2644.1)-----—------ <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS, 490-66 <br /> [!�3.SPIMRTE_"TSARF TESTED ANNUALLY. --------------------------------- <br /> 490-67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> PU Alarm logs 490-68a []Visual Inspection Records 490-68b El Tank integrity testing results 490-68c <br /> El SIR testing results(and supporting documentation records). 490-68d E] Tank gauging results(and supporting documentation records). 490-68e <br /> F_]ATG Testing results(and supporting documentation records).490-68f [] Corrosion Protection 60-day logs 490-68g <br /> El Equipment maintenance and calibration records. 490-68h <br /> IX.TRAINING <br /> ❑Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> El STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> E] OTHER(Specify):M69h,M69i <br /> 1A This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices <br /> > The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> > The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> > Names of contact person(s)for emergencies and monitoring alarms.49o-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> /f- q,I- '� t,4 2,�,TA--5 5,c--T- /P7 C) <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for perfqrming the monitoring and equipment maintenance: <br /> NAME _rP I V_J 490-72 TITLE C)UJ 4 t� 490-73 <br /> NAME 490-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNERIOPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: ryry 490-77 <br /> Authwized Revresentafive of O"er <br /> REPRESENUN1 <br /> G C1 ,Tank Q_"er/ r <br /> Omator 9,� J7 <br /> APPLICANT NAME(print) 490-78 APPLICANT TIL : 490-79 <br /> -THI 4 C) <br /> UPCF UST-D(12/2007)3/4 <br />