Laserfiche WebLink
Jan 04 99 01:45p Elite IV Contractors Inc. 209-461-6342 P.5 <br />a. Remove 1/4 -inch pipe plug frk Lest portin <br />the peclw (on. &jncb..Big-.Flo_ applications, re- <br />m . ove the 1/4_jAch pjpc plug from the riser/flange <br />assembly). <br />b. Apply a UL-clasaifted non-toxic pipe thread seal- <br />ant to the IM -inch NPT 46-degme elbow and <br />install in tank test port of the packer : On fiAnch, <br />Big -Flo applications, the V4 -inch NPT 45 -degree <br />elbow may beinstalled into the risariflange <br />assembly. <br />c. Install a V4 -inch Iff? tee oil the 45 -degree elbow <br />that is in the tank test port (or an G -inch Big -Flo <br />riser/flange oa8emblyJ to accommodate both the <br />vent tube and snap tap. <br />d. Apply a UL-classifted rion-toxic pipe thread Deal - <br />sat to: the 6res& of tha.1/4-inchNYI HU ------ <br />elbow vent tube fitting and install in the tee. <br />e. Apply a UL -classified non. -toxic pipe thread seal- <br />ant to the throadst of the 1/4 -inch NPT straight <br />vent tube fittingand install in the leak detector <br />vent opening in the cap of the leak detector. <br />Install <br />t natal] the vent tubing into both fittinp and <br />tighten. <br />g. To install sasp tap connecters in FX2V472DV <br />models, apply a UL -classified non-toxic pipe <br />thread sealant to the snap tap conowtors and <br />install one in the body of the FXV leak detector <br />and the other in the tee attached to the 45-deam <br />4ow i natalled in the tank fast port ofthe packer. <br />On 6 -inch Big -Flo applications, install the two <br />snap tap connectors — one in .the FXV leak <br />detecWr and one in the riaer/floace assembly. <br />h. Attach and crimp loop of the retaining tether <br />around the Snap Tap.threads: <br />L Replace the cope over the quick -connect cou- <br />plings and tighten snugly.. <br />9: Affix the enclosed.decals to the dispenser dial glass on <br />grade of,gasoline upon whieh the leak detector is <br />being installed. Additional decals are available; call <br />customer mMce at 1-000-9524348 or (913) 498-5100. <br />10. 1 ri, epeet all threadedjoinU to assure they are tight and <br />not leaking. <br />Test of the Leak, Detector <br />U.S. Envirenmen:W protection Ajeney (EPA) regulations re- <br />quire annual verification of operation of leak detector. To <br />assure maintenance of -lea dcapability, Red Jacket <br />requim that operation of the mechanical leak detector be <br />verified by testing upon start-up and that testing of the leak <br />detector be performed routinely at least annually. <br />Tea promdure op6ovs for meebailleal <br />leak detectoftemexplained in Red Jadwt <br />Engin "ring Reporte RjBoa 22.Teh <br />Red jeaet Snap Tap couneaters allow <br />the ,r=VfflX20Vleak datectorto be teeted <br />with libe YXV Snap Tap Tooter as an op• <br />tiou to the above test methods. See Red <br />Jacket lite 113.1 for test in - <br />us! Snap <br />n- <br />usix4FSump Tap Connectors. <br />11. The top cover on the Red Jacket leak detector is <br />designed to accommodate a sealing wire which can be <br />used to dismurage tempering or the unauthorized <br />removal of the leak de (see Figure 2). <br />See technical ba4atin'1042-112.1 for use <br />of Snap Tap Co—etor Assembly. <br />7. 'Conned power to pump at the load center. FX2Y <br />8. 'Clear remaining air from system as follows: <br />a. Turn on dispenser thatis farthest from the leak <br />detector but donot open nozzle. Waftfourorfive <br />minutes or'more. Look for looks on parts <br />workedon. SNAP' <br />h: Shut effthepimili andallow ittostandlourorfive <br />minutes -Then start the Punip in and <br />open the nozzle farthest from the leak detector. <br />c. Continue to dispense enough gasoline, about 20 <br />to 30 gallons (78 to 114 liters). to pump ALL -air FIgure <br />from the tem. <br />N',ICE JAMI-061 "I <br />(I I 1pm) er'lese witli ois nogito open, the <br />leakdetectarlbas not Opened. R"Gat Aep <br />as with increased rMaWag time at pump <br />t� insure the pw&g of &U air. Ali edir <br />must be puxVed fiam, the system or 0AS <br />leak detector -61 restrict flow to about <br />a CPO (11 lipm). <br />-two.dow-M Comm" <br />7401 W. 129 St. *,overland Park, KS 66213. 913-498-5700 <br />Marley Pump reserves Me right to make design improvements and <br />WaS madMa"ris as "cesmy and weoiil notice. <br />01994 Marley PUMP Printed in USA <br />It 6 be poWd that if tM dispessiAg <br />joystem(the solenoldvalve andtU-10) <br />is opened previous to the completion of <br />the line ton, the M Series -111 detect <br />thisopenieswas leak and r"trioted Saw <br />will r*sult. closing of the aozrlo(&) for a <br />period of "a adequate to allow comple- <br />tion of tb& lixis test will allow the 100k <br />detector to open. Pace opened. full POMIP <br />Ilow can ba-yronrlded. <br />MTRM <br />I <br />.9ff_A= <br />114 -INCH <br />T -FITTING <br />VENT TUBE <br />