My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_1992-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 10:20:59 AM
Creation date
6/3/2020 9:58:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992-2000
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_1992-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />1� <br />3/8' Reinforced Diamond Plate <br />with special cam lock mech's, <br />and Grade 8 Cad Plated Bolts <br />with seals. <br />12 Ga. Rolled <br />Steel Frame High Density Polyethylene <br />Sump Shield #SC -3001 -SS <br />„ O Q <br />To set the elevation for the fiberglass sump, the optimum <br />position should be 8" below finished concrete or asphalt <br />grade. This allows a 1" overlap for steel spill collector <br />frame when it is elevated 1 " above finished concrete grade. <br />This elevation setting also positions the light weight high <br />density polyethylene sump shield, number SC -3601 -SS to <br />the right position for eliminating water intrusion. Cut the <br />4" Ell pipe riser to a length of 14 1/2" below Anished <br />concrete grade. (Not the 1' elevated grade) <br />After all grades are set and tanks are back filled to top of <br />fiberglass sump, Spill Collector can be installed. Now <br />install the light weight high density polyethylene sump <br />shield with the proper openings cut out. ?hen install the <br />nylon spill collector bucket, hand tighten against "O"ring, <br />if the Spill Collector is used on the vapor side install vapor <br />spill collector now. (Vapor spill collector is different. It is <br />1 " shorter on the 4" riser, be sure to check this). <br />Now the spill collectorlid and frame can be installed. Using <br />cam lock mechanism to fasten the Ed to the frame by <br />ming bolts clockwise until cams inter -lock with dimples <br />in frame, then tighten approximately one tum more to <br />tighten down against seal. (Do this in a cross lid pattem <br />which will apply even pressure on seal). After the lid is <br />properly installed on the frame, it can now be positioned <br />over sump and spill collector bucket. It may be to your <br />advantage to leave offspill collector bucket "O"ring on this <br />initial installation and after concrete is poured then remove <br />Ed and install "O" rings to final installation. <br />Be sure when lid and frame are installed that 36 "lid is atleast <br />1 'above finished concrete grade and that collector bucket is <br />2" below flange in collector. <br />If these instructions are followed you should have an <br />attractive and easy installation. <br />SUMP COVER LID REMOVAL <br />For ease of removal we have furnished Jack screws. First, <br />tum all hold down bolts (1/2 Hex) counter clockwise to stop. <br />Next, remove button head alien screws (Do not discard)insert <br />"7" handle Jack screws in threaded hole (if "T" handles are <br />not available use 5/16" -18 bolts) and raise lid. When lid is <br />free from collector bucket "O"ring use "T" handle to lift lid <br />from sump. <br />To replace lid simply lower lid over spill collector buckets. <br />Remove "T"handles and press lid into place, tum hex bolts <br />clockwise until pressure is felt, then in cross lid tightening <br />pattern, tighten bolts to draw lid down against the seal <br />evenly. Please re-tastaft the button bead a11en screws. <br />
The URL can be used to link to this page
Your browser does not support the video tag.