Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> 8900 SHOAL CREEK,BUILDING 200 <br /> TEST DATE: 05/12/99 AUSTIN,TEXAS 78757(512)451-6334 WORK ORDER NUMBER: 2208542 <br /> CLIENT: CHEVRON, U.S.A. SITE: CHEVRON 201761 <br /> imal <br /> Tank ID: 92 3 Tank manifoided: No Bottom to top fill in inches: 96.0 <br /> Product: SUPREME Vent manifoided: No Bottom to grade in inches: <br /> Capacity in gallons: 12,000 Vapor recovery manifoided: YES Fill pipe length in inches: <br /> Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: <br /> Length in inches: 387 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DW FIBERG Installed: ATG Stage II vapor recovery: BALANCE <br /> CP installed on: <br /> COMMENTS <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: VEEDERRooT <br /> Fluid volume in gallons: Model: L.L.D. <br /> Tank water level in inches: S/N: <br /> Test time: NOT Open time in sec: <br /> Number of thermistors: TESTED Holding psi: NOT <br /> Specific gravity: Resiliency cc: TESTED <br /> Water table depth in inches: Test leak rate ml/m: 189.0 <br /> Determined by(method): Metering psi: <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> Test time: Material: DW FXBERG <br /> Ullage volume: Diameter(in): 2.0 <br /> Ullage pressure: Length(ft): 125.0 <br /> Results: Test psi: <br /> Bleedback cc: <br /> DATA FOR UTS-4T ONLY: Test time(min): <br /> Test 1:Start time: <br /> Time of test 1: Finish psi: NOT NOT NOT NOT <br /> Temperature: NOT Vol change cc: TESTED TESTED TESTED TESTED <br /> Test 2:Start time: <br /> Flow rate(cfh): TESTED Finish psi: <br /> Time of test 2: Vol change cc: <br /> Test 3:Start time: <br /> Temperature: Finish psi: <br /> Flow rate(cfh): Vol change cc: <br /> Time of test 3: Final gph: <br /> Temperature: Result: <br /> Flow rate(cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: UNKNOWN <br /> Draft 06/02/1999 15:30 MSHAW <br />