Laserfiche WebLink
SWRCB,January 2002 Page of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: iping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: essure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:TN, v r•@ ca � �,,��y �}( a Equipment Resolution: ' c]el Z. <br /> 4 <br /> Piping Run# Piping Run# Piping Run# ' iping Run# <br /> Piping Material: i faeA .4SS <br /> Piping Manufacturer: 5 �. <br /> Piping Diameter: 3 3 YO <br /> Length of Piping Run: t?� Aqavvy, 2 7- t <br /> Product Stored: r I <br /> Method and location of Cts 54��r pt�a,,,� <,��, <br /> piping-run isolation: T t T ti ,,,O -11-3 <br /> Wait time between applying ` <br /> ressure acuum/water and qq <br /> test: I .C3 I ato` t Lt. <br /> Test Start Time: ,, ca c) 6"6 <br /> Initial Reading(R): 5 P, P 5 E- <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: L o „ <br /> Change in Reading(RF-R): P 57r- P 5 7 P-5,77 <br /> Pass/Fail Threshold or <br /> Criteria: 5-1J+ s i, 1 J ..,. 404q g <br /> Test Result: Pass ❑Fail Pass ❑Fail ass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />