My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2001-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:22:36 AM
Creation date
6/3/2020 9:58:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2007
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2001-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 'I of <br /> 9. SPILL/OVERFILL CONTAYPTMOENT BOXES <br /> Facility is Not Eqg!pped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Tet Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ❑ ofessional Engineer <br /> ❑Other(Sped) <br /> Test Method Use . ❑Pressure ❑Vacuum ❑Hydro <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipme solution: <br /> Spill Box# Spill Box# Spill Boz# Spill Boz# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in R g(RF-Rj): <br /> Pass/Fa' shold or <br /> Critepd- <br /> Telft Result: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass. ❑ <br /> Comments— include In ormation on repairs made rlor to testin , and recommended o11ow-u o ailed tests <br /> C46,44s .J cvAmtcgy I Af &V r P1a E r r_. J <br />
The URL can be used to link to this page
Your browser does not support the video tag.