Laserfiche WebLink
NN Ah <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> .fr TanknoloW <br /> TESTDATE: 06/03/02 8900 SHOAL CREEK,BUILDING 200 WORK ORDER NUMBER: 2222210 <br /> CLIENT: CHEVRON, U.S.A. AUSTIN,TEXAS 78757(512)451-6334 SITE: CHEVRON 201761 <br /> Tank ID: #3 1 Tank manifolded: NO Bottom to top fill in inches: 96.0 <br /> Product: REGULAR Vent manifolded: No Bottom to grade in inches: <br /> Capacity in gallons: 11,682 Vapor recovery manifolded: YES Fill pipe length in inches: <br /> Diameter in inches: 91.00 Overfill protection: YES Fill pipe diameter in inches: <br /> Length in inches: 387 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DW FIBERG Installed: ATG Stage 11 vapor recovery: BALANCE <br /> CP installed on: <br /> COMMENTS <br /> 1:1glIgE <br /> : <br /> RNEST <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: VEEDERROOT <br /> Fluid volume in gallons: Model: L.L.D. <br /> Tank water level in inches: S/N: ELECTRONIC <br /> Test time: NOT Open time in sec: <br /> Number of thermisters: TESTED Holding psi: NOT <br /> Specific gravity: Resiliency in ml: TESTED <br /> ater table depth in inches: Test leak rate ml/m: 189.0 <br /> Determined by(method): Metering psi: <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: FAIL <br /> COMMENTS COMMENTS <br /> EN <br /> 00 <br /> U-ST <br /> %......... .. <br /> Test time: Material: DW FIBERG <br /> Ullage volume: Diameter(in): 2.0 <br /> Ullage pressure: Length (ft): 300.0 <br /> Results: Test psi: <br /> Bleedback cc: <br /> DATA FOR UTS-4T ONLY: Test time (min): <br /> Test 1:Start time: <br /> Time of test 1: Finish psi: NOT NOT NOT NOT <br /> Temperature: NOT Vol change cc: <br /> Test 2:Start time: TESTED TESTED TESTED TESTED <br /> Flow rate (cfh): TESTED Finish psi: <br /> Time of test 2: Vol change cc: <br /> Test 3:Start time: <br /> Temperature: Finish psi: <br /> Flow rate (cfh): Vol change cc: <br /> Time of test 3: Final gph: <br /> Temperature: Result: <br /> Flow rate (cfh): Pump type: PRESSURE <br /> LOMMENTS Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: NO <br /> Printed 08/01/2002 08:34 MSHAW <br />