Laserfiche WebLink
INDIVIDUR TANK INFORMATION AND ST RESULTS <br /> Z00 <br /> 8900 SHOAL CREEK, BUILDING 200 <br /> TEST DATE: 06/11/01 AUSTIN,TEXAS 78757(512)451-6334 WORK ORDER NUMBER: 2216986 <br /> CLIENT: CHEVRON, U.S.A. SITE: CHEVRON 201761 <br /> ............................................................................................................................................................................................................................................................................................................................................................................................. <br /> Tank ID: 92 3 Tank manifolded: No Bottom to top fill in inches: 96.0 <br /> Product: SUPREME Vent manifolded: NO Bottom to grade in inches: <br /> Capacity in gallons: 12,000 Vapor recovery manifolded: yES Fill pipe length in inches: <br /> Diameter in inches: 96.00 Overfill protection:yEs Fill pipe diameter in inches: <br /> Length in inches: 387 Overspill protection:yEs Stage I vapor recovery: DUAL <br /> Material: DW FIBERG Installed: ATG Stage 11 vapor recovery: BALANCE <br /> CP installed on: <br /> COMMENTS <br /> PSI at tank bottom New/passed Failed/replaced New/passed ailede laced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: VEEDERROOT <br /> Fluid volume in gallons: Model: ELECTRONIC <br /> Tank water level in inches: S/N: <br /> Test time: Open time in sec: 4.00 <br /> Number of thermisters: NOT <br /> TESTED Holding psi: 30 NOT <br /> Specific gravity: Resiliency cc: TESTED <br /> Water table depth in inches: Test leak rate ml/m: 189.0 <br /> Determined by(method): Metering psi: 10 <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: FAIL <br /> COMMENTS COMMENTS <br /> 1 LAO." T I* I�if IER T ............ <br /> ;<<.:':tits :::: ;'>'::;>; ..._.. .s;'::<_:::><::::::::: :::€:::::::c i::€:>::: :::: i:::::: i'.... <br /> ...... . . ......:............................................................................................................................................................................. <br /> Test time: Material: DW FIBERG <br /> Ullage volume: Diameter(in): 2.0 <br /> Ullage pressure: Length(ft): 125.0 <br /> Results: Test psi: <br /> Bleedback cc: <br /> DATA FOR UTS-4T ONLY: Test time(min): <br /> Test 1:Start time: <br /> Time of test 1: Finish psi: NOT NOT NOT NOT <br /> Temperature: NOT Vol change cc: <br /> Test 2:Start time: TESTED TESTED TESTED TESTED <br /> Flow rate (cfh): TESTED Finish psi: <br /> Time of test 2: Vol change cc: <br /> Test 3:Start time: <br /> Temperature: Finish psi: <br /> Flow rate(cfh): Vol change cc: <br /> Time of test 3: Final gph: <br /> Temperature: Result: <br /> Flow rate(cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational:UNKNOWN <br /> Printed 06/12/2001 09:16 CCHAPA <br />