Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> RESPONSE PLAN--PAGE 1 One form per facili <br /> R01. <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> I. FACILITY OON <br /> AGILITY ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> Chevron station#201761 <br /> BUSINESS SITE ADDRESS 103. BUSINESS 'ITE CITY 104. <br /> 1103 S.Main St. anteca,CA 95337 <br /> H. S CO ROL CLE'` PMETHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONT OL . CLE =UP EQUIPMENT <br /> PERIODIC ENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> quipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> QUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (ConVwkie.onl if licable <br /> EQUIPMENT LOCATION AVAB ABELrrY <br /> R10. R20. Rao. <br /> R11. R21. R31. <br /> R12. R22. - _ R32. <br /> R13. R23. R33- <br /> R14. R24. - R34. <br /> R15, R25. R35. <br /> IV, SPONS LE PERSONS <br /> THE FOLLOWING PERSON(S)IWARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40. TITLE I R50. <br /> Chevron Maintenance.Dispatch Solve One Help Desk866-845-4254 <br /> NAME <br /> R41. TITLE R51. <br /> Chevron Eme enc Information Center CEIC 800-231-0623 <br /> NAME Rae. TITLE R52' <br /> NAME R43. TTfLE R53. <br /> V. MONTO G 1CA .0 <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ®1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ®2. INSPECTION BY QUALIFIED PERSONS ®3. RECALIBRATION OF EQUIPMENT R60. <br /> ® <br /> 99. OTHER(specify):The affected UST System will be shut down for a third party precision test(s)to verify and isolate if a release has occurred. R61. <br /> UN-022B-8/9 www.unidoes.org Rev.04/02/08 <br />