Laserfiche WebLink
9 0 <br /> Page 1 of 1 <br /> SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Fill Riser Containment Sumps <br /> Fill Riser Containment Sumps are Present, but were Not Tested <br /> Test Method Developed By: r Spill Bucket Manufacturer ro Industry Standard r Professional Engineer <br /> Other(Specify): <br /> Test Method Used By: r Pressure G Vacuum f Hydrostatic <br /> !' Other(Specify): <br /> Test Equipment Used:: VACUUM TEST =Equipment Resolution: 0.1 g�h� <br /> Spill Box# Spill Box# Spill Box# <br /> Tank T1 Supreme SUPREME Tank T2 Regular 2 REGULAR Tank T3 Regular 1 REGULAR Spill Box# <br /> Ffil-Direct Fill-Direct Fill-Direct <br /> Bucket Diameter 12.00 12.00 12.00 <br /> Bucket Depth: 13.00 13.75 12.75 <br /> Wait time between applying <br /> pressure/vacuum/water and 1 min 1 min 1 min m i n <br /> starting test <br /> Test Start Time: 10:07:00 10:03:00 09:59:00 <br /> Initial Reading m,): 30.00 PSI 30.00 PSI 30.00 PSI <br /> Test End Time: 10:08:00 10:04:00 10:00:00 <br /> Final Reading(R�: 30.00 PSI 27.00 PSI 29.00 PSI <br /> Test Duration: 1 min 1 min 1 m i n <br /> Change in Reading(RKR,): 0.00 PSI -3.00 PSI -1.00 PSI <br /> Pass/Fail Threshold or Criteria: +/-0.00 +/-3.00 +/-1.00 <br /> Test Result: PassPass Pass <br /> Comments?(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> I <br /> f <br /> € <br /> WO:2308165 <br />