Laserfiche WebLink
r <br /> Tanknology <br /> Emergency Stop ( -Stop / ESO) Periodic Inspection <br /> Facility information Te&hn pian fttformatf <br /> Site#:201761 Date:1/18/2013 <br /> Address:1103 S.MAIN ST.PERMIT NUMB.N-3315 Name:Steven Willems <br /> City/State:MANTECA CA � » <br /> Technician Signature: <br /> The objective of this test is to provide assurance that the when the E-Stop switch is activated,all the fueling system circuits(turbines,and <br /> dispensers)are de-energized,and remain de-energized until they are re-set manually).The test procedures and guidelines shall be in accordance <br /> with the E-Stop Testing Process. <br /> SITEBA7 A <br /> 1 Number of E-Stop switches INSIDE of the building: 1 <br /> 2 Number of E-Stop switches OUTSIDE of the building: 1 <br /> PER Ft RMPrNCE PAT Yes Tho tiA <br /> 3 You have added or confirmed that all E-Stop locations are on the Site Diagram ro r <br /> 4 Do all E-Stops shutdown power to ALL DISPENSERS ro r r <br /> 5 Do all E-Stops shutdown power to ALL STP's to r <br /> 6 Are ALL E-Stops clearly Labeled ro r t <br /> 7 Are the TURBINE BREAKERS clearly identified/labeled �o r <br /> t+OSTTi ST <br /> 8 All equipment secured and any access ports, lids,enclosures are closed. t+ t <br /> 9 All safety barricades and test equipment has been properly removed #o r <br /> 10 E-Stop was reset and all dispensing functions are normal fo r <br /> E-Stop Inspection Results <br /> 11 PASS I FAIL INCONCLUSIVE <br /> {'t7fnmEifliS{ leafty dBSCrlbB any defi�'tF3nCi" fourti) <br /> WO:2308165 <br />