Laserfiche WebLink
Recommended Practices for the A and Verificadon of Spill,Overfill,Leak Detection andkdaiy Containment Equipment at UST Facilities <br /> ing requirementss t sr o <br /> practice am <br /> general statements and may vary Recommended pres- 6, SPILL BUCKET AND <br /> sure levels W test durations am addressed in Section 5.7. CONTAINMENT SUMP <br /> Piping manufacturers'test procedures may differ. TESTING <br /> This test can be conducted in sections or as one con- <br /> tinuous pipe depending on the installation.Care should be 6.1 General. Spill buckets and containment sumps for <br /> taken toe that the entire secondary containment of tank systems are neither intended nor designed for the <br /> the piping system is tested. storage of petroleum products,but rather to contain small <br /> 5.6 Test Equipment. Test equipment shall include: leaks and spills for short periods of time. This section <br /> describes the procedures used to test the integrity of spill <br /> * inert gas source(nitrogen,helium,etc.); buckets and containment sumps to ensure that they do not <br /> * Stopwatch orother time-measurement device capable leak- <br /> of measuring a I-second increment; 6.2 SON Bucket Integrity Testing — Hydrostatic <br /> * test tubing assemblies (Tubing assemblies provide Test Method. <br /> access to the beginning and end of the interstitial <br /> space.); WARNING: Do not use fuels such as gaso- <br /> * pressure gauge with a 15 psig maximum pressure read- line, ESS or diesel as a test fluid because <br /> ing with 0.5 increments. they present a serious fire and safety <br /> ® Gasoline vapors are flammable <br /> 5.7 Test Procedure. and can explode If exposed to an Ignition <br /> 1.If necessar)4 re-install termination (test) is at pip- source such as a spark or open flame. If <br /> ing terminations. a tank or containment area Is not tight, <br /> iill <br /> 2.If necessary,connect the tubing assemblies to the see- using fuel as the test flud wcause a <br /> release into the soil or groundwater. <br /> ondary containment termination fitting on each end of <br /> the section of piping to be tested. <br /> 3.Connect the inert gas source and pressure gauge. <br /> 4.Gradually pressurize the interstitial space to 5 psig. <br /> Close the valve and allow the pressure to stabilize. <br /> Repressurize to the specified test pressure if necessary. Water Level <br /> ®Observe the pressure for a period of 1 hour. <br /> 6.If the piping pressure after I our is less than the test <br /> pressure,check termination fittings and test assemblies <br /> for leaks. <br /> ......... .... <br /> 7®Release the pressure on ffie system slowly. <br /> 8.Remove the test equipment. <br /> 9.Restore the piping to its normal operating condition. <br /> 5.8 Pass/Fall Criteria. If no pressure change occurs <br /> during the test period, the piping system passes the sec® FIGURE . The hydrostatic method of determining <br /> ondary containment integrity test, split bucket integrity uses water to detect leaks. The <br /> If <br /> the is any drop in pressure over the test period, the measuring stick must be placed in the same location <br /> piping fails the secondary containment integrity test. at the beginning and end of the test period to ensure <br /> If there is any increase in pressure over the test period, accurate water level readings. <br /> repeat the test. <br /> pel.org <br />