Laserfiche WebLink
04/30/2012 11:41 1561 CHEVRON * PAGE 02/02 <br /> 4AChevron ProCompany ducts AQ <br /> Underground Storage Tank Systent <br /> Designated operator Facility Employee Training Log <br /> Chevron #201761 <br /> at <br /> section 27 15 of Title 23,California Code of Regulations,requires that Desigmted Underground storage TaDk Operators Provide <br /> as tile operation and/o,maintanance of underground after <br /> training to facility employees who have responsibilities sociated with employees hired after <br /> (UST)systems. This training must be provided by Julyl,2005,and every 12 months theTeAer. For facility <br /> be provided within 30 days of the date Of hire- At lease one of the facility emPlOYew present <br /> July 1,2005,the initial training must is as 5 "ified in <br /> during operating hours must have current tralw ng. This train,.ng must include,but is not limited to,the following items P <br /> and(2): <br /> k <br /> ity <br /> j <br /> 0 <br /> ner <br /> a <br /> p <br /> p <br /> m <br /> 10 <br /> r <br /> pat <br /> o <br /> ye <br /> 10 0 <br /> yad <br /> s <br /> ew <br /> provide <br /> g Items g pre <br /> w'P" <br /> 23 CCR ons 2715(f)(1) Pra tices <br /> C <br /> M M <br /> operation of the UST system,in a manner Msirltmt w6 the facility's Best Mwmgement UST monitoring Plan; <br /> a role with regard to UST monitoring equipment as specified.in the written <br /> The employee <br /> The loyee's role with regard to <br /> spills and overfills as specified in the written.UST Response Plan; <br /> emp <br /> as and monitoring equipment alarnis- <br /> in <br /> of contact person(O for emergenci in the training program <br /> or facilities that are not routinely M04 facility employee responsi.bilities as specified <br /> approved hY the local ST regulatory agency. <br /> Hire Date Desi d erator Si e Date <br /> Emplo eName riAt S A. re <br /> Uk. <br /> OY 11 <br />