My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2011-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:31:21 AM
Creation date
6/3/2020 9:58:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2014
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2011-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification-Page 2 of 3 <br /> Site Address: 1103S. Ma!nSt Date of Testing/Servicing: 1119/12 <br /> M Results of Testing J Servicing <br /> Software Version Installed- 330.00 <br /> Complete the foliowin' checklist: <br /> ig Yes o No* Is the audible mal? <br /> 0 Yes 11 NO* Is the visual alarm operational? <br /> 09 Yes 0 No* Were all sensors visually inspected,functionally tested,and confirmed 22erational? <br /> 00 Yes D No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their 2Loper operation? <br /> 9 Yes 0 No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g,modem) <br /> ci N/A I? <br /> N Yes 0 No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) 0 Sump/Trench Sensors; 0 Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? 3 Yes 0 No <br /> 0 Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> o N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fill points)and operating properly? If so,at what percent of tank ca2acity does the alarm trigger? 0 % <br /> 0 Yes* CC No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> 0 Yes* M No Was liquid found inside,any secondary containment systems designed as dry systems? (Check all that app-1y) <br /> 0 Product;0 Water. If yes,describe causes in Section E,below, <br /> 3 Yes 0 No* Was monitoring system set-up reviewed to ensure proper settings? (Attach set-up reports, if applicable.) <br /> Do Yes 0 No* Is all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected, <br /> E. Comments• <br />
The URL can be used to link to this page
Your browser does not support the video tag.