flM PEI/RPI 200-12 <br /> there are items that must be repaired or replaced 6.5.6 Test Procedure. <br /> (e.g., deteriorated penetration fitting boots), 1.Begin the test by adding water to the sump to a <br /> notily the owner/operator and obtain approval minimum of 4 inches above the highest sump <br /> prior to proceeding with repairs. penetration or sump sidewall seam,whichever is <br /> 4.Test boots or secondary con tairtment terniina- higher. To compensate for sump deflection, the <br /> tion fittings must be present on the piping pen- water must be allowed to settle a minimum of <br /> etre ting the sump. During testing, these fittings 15 minutes before taking the initial test measure- <br /> prevent water from entering the interstitial space me If the highest sump penetration or sump <br /> of double-walled piping. NVithout these fittings, sidewall seam is less than 4 inches from the top <br /> the integrity of the sump cannot be tested using of the sump, add water to within I inch of the <br /> this method. top of the sump. <br /> interstitial monitoring sensors are present 2.Place the measuring stick vertically at the lowest <br /> within the containment sumps, temporarily point in the sump and extending above the water <br /> remove them before conducting the test. If the level in the sump to allow for an accurate mea- <br /> sensor is removed, reposition after testing to surement to betaken. The location of the mea- <br /> appropriate. position according to the manufac- s stick must remain the same fore water <br /> turer's instructions, level measurement. Document the initial water <br /> 6.If the containment surnp is found to have cracks level measurement as measured from the bottom <br /> loose parts or separation of any joints or penet;;- of the sump. Alternative measurement metho d6 <br /> , <br /> tion fittings, it is not considered to be liquid- may be used provided that the measurement to <br /> tight This visually indicates a test failure. 1/16(0.063)inch can be made. <br /> 3.Take all precautions to prevent the water level <br /> CAUTION: Water can damage electrical from being disturbed during duration of the <br /> connections. Ensure that there are no test. <br /> components that can be damaged by the 4.After I hour, document the ending water level <br /> addition of water to the sump. If such measurement. <br /> components are present,take appropriate 5.Upon completion of the test: <br /> precautions when performing the test or <br /> use an alternative test method. ove all water and properly dispose of it <br /> according to Section 6.7; <br /> - reinstall any interstitial monitoring sensors in <br /> their proper positions; <br /> ® return the test boots or secondary contain- <br /> ment fittings to their pre-test operating con- <br /> figurations; <br /> Water EI ri <br /> Love <br /> Junction <br /> FBOX <br /> Conduit <br /> Water <br /> Product <br /> Piping <br /> Electrical <br /> Condult <br /> e Pr <br /> FIGURE 6-5. The test tluld level in the UDC must be at adLJW <br /> Piping <br /> least 4 inches above the highest sump penetration or <br /> side ll seam. <br /> FIGURE To prevent leakage, check all penetration <br /> fittings before adding water to ensure they make a tight <br /> sea/. <br /> pei.org <br />