My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2011-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:31:21 AM
Creation date
6/3/2020 9:58:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2014
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2011-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order: 2279307 <br /> Page`of <br /> sN RCB,7anuary 2002 <br /> 7. UNDER-DISPENSER CQNTAJN N7C(UDC TESTING _ <br /> Test Method Developed By: 0 UDC Manufacturer ❑Industry Standard �n Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: D Pressure ❑Vacuum Hydrostatic <br /> n Other(Spec) <br /> Test Equipment Used:ELLDS Equipment Resolution: .0007 <br /> UDC# UDC# UDC# UDC# <br /> UDC Manufacturer: h <br /> UDC Material: _ <br /> UDC Depth: <br /> Height from UDC Bottom to Top 4? <br /> of 1jig1jest pip penetration: ------- <br /> Height <br /> I <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: — <br /> Condition of UDC prior to <br /> testing: 2"above highest 2"above highest <br /> Portion of UDC Tested 2"above highest 2"above highest g cnetration <br /> �renetration enetration Penetration <br /> Does turbine shut dov�m when <br /> UDC sensor detects liquid{both CYes QNo 3'.A ❑Yes ONo DNA -'Yes 0 N DNA ,7 Yes ❑No DNA <br /> -product and water)?* NIA NIA NIA <br /> Turbine shutdown response time NIA _ — <br /> T system programmed for fail- 1J Yes D No F- n Yes LINO O NA i 0 Yes 0 No D ISA D Yes 0 No DNA <br /> safe shutdown?* -- <br /> Was fail-safe verified to be D yes ONO GhNA I 0 Yes 0 No 0 NA U Yes D No ❑NA ❑Yes ONO ❑NA <br /> _operational?' — <br /> Wait time between applying30 minutes <br /> pressure(vacuum/water and 30 minutes 30 minutes '— <br /> startin test -•-- - <br /> Test Start Time: - --� <br /> Initial-Readu)I RJBTest End End Time: > <br /> Final Reading(Ri:): <br /> Test Duration. <br /> 15 minutes _ nues <br /> t 15 minutes <br /> nut15 minutes 15 mi <br /> _ _ _ <br /> Change in Reading(Rt.-RJ: 0.0020 0.0020 0.0020 <br /> Pass/Fail Threshold or Criteria: 0.0020 <br /> Test Result_4 Pass Q Fail ❑ Pass CJ Fail Cl Pass 0 Fail D Pass Cl;Fail <br /> Was sensor removed for testing? f <br /> 'o`es ❑No [ NAQ Yes `To Q NA G Yes Q No0 NAC'.Yes DNo 0NAWas sensor properly replaced andIyes tl No Q NA D Yes O No DNA ❑Yes ❑No 0 NA ❑Yes D No DNA <br /> verified functional after testing? _ - <br /> Comments— include it formation on repairs made prior•to testin and recommended ollo--up for failed tests) _ <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SVdRCB LG-160) <br /> Tanknology Inc. 11000N.MoPac Expressway,Suite 500,Austin,Texas 78759 <br />
The URL can be used to link to this page
Your browser does not support the video tag.