Laserfiche WebLink
Work Order: 2279307 <br /> Page`of <br /> sN RCB,7anuary 2002 <br /> 7. UNDER-DISPENSER CQNTAJN N7C(UDC TESTING _ <br /> Test Method Developed By: 0 UDC Manufacturer ❑Industry Standard �n Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: D Pressure ❑Vacuum Hydrostatic <br /> n Other(Spec) <br /> Test Equipment Used:ELLDS Equipment Resolution: .0007 <br /> UDC# UDC# UDC# UDC# <br /> UDC Manufacturer: h <br /> UDC Material: _ <br /> UDC Depth: <br /> Height from UDC Bottom to Top 4? <br /> of 1jig1jest pip penetration: ------- <br /> Height <br /> I <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: — <br /> Condition of UDC prior to <br /> testing: 2"above highest 2"above highest <br /> Portion of UDC Tested 2"above highest 2"above highest g cnetration <br /> �renetration enetration Penetration <br /> Does turbine shut dov�m when <br /> UDC sensor detects liquid{both CYes QNo 3'.A ❑Yes ONo DNA -'Yes 0 N DNA ,7 Yes ❑No DNA <br /> -product and water)?* NIA NIA NIA <br /> Turbine shutdown response time NIA _ — <br /> T system programmed for fail- 1J Yes D No F- n Yes LINO O NA i 0 Yes 0 No D ISA D Yes 0 No DNA <br /> safe shutdown?* -- <br /> Was fail-safe verified to be D yes ONO GhNA I 0 Yes 0 No 0 NA U Yes D No ❑NA ❑Yes ONO ❑NA <br /> _operational?' — <br /> Wait time between applying30 minutes <br /> pressure(vacuum/water and 30 minutes 30 minutes '— <br /> startin test -•-- - <br /> Test Start Time: - --� <br /> Initial-Readu)I RJBTest End End Time: > <br /> Final Reading(Ri:): <br /> Test Duration. <br /> 15 minutes _ nues <br /> t 15 minutes <br /> nut15 minutes 15 mi <br /> _ _ _ <br /> Change in Reading(Rt.-RJ: 0.0020 0.0020 0.0020 <br /> Pass/Fail Threshold or Criteria: 0.0020 <br /> Test Result_4 Pass Q Fail ❑ Pass CJ Fail Cl Pass 0 Fail D Pass Cl;Fail <br /> Was sensor removed for testing? f <br /> 'o`es ❑No [ NAQ Yes `To Q NA G Yes Q No0 NAC'.Yes DNo 0NAWas sensor properly replaced andIyes tl No Q NA D Yes O No DNA ❑Yes ❑No 0 NA ❑Yes D No DNA <br /> verified functional after testing? _ - <br /> Comments— include it formation on repairs made prior•to testin and recommended ollo--up for failed tests) _ <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SVdRCB LG-160) <br /> Tanknology Inc. 11000N.MoPac Expressway,Suite 500,Austin,Texas 78759 <br />