My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2015-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 11:50:06 AM
Creation date
6/3/2020 9:58:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2018
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2015-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUNDSTORAGETANK <br /> RESPONSE PLAN—PAGE I (Oneresam per facility) <br /> i'YPE OF ACTION ® I.NEW PLAN ® 2.CHANGE OF INFORMATION Rua. <br /> 77. <br /> :r: ;:: :;':...,.:..;.:.`:.:.:?:':i: i.o::::::'.:::;:'.,;:,::::•ct:;.,:;1ItACI[ : ::. 'iIT <br /> vo . <br /> FACILITY ID#Ogancy Ow Only) <br /> BUSINESS NAME(Scone as FACILITY NAME) Chevron Station#201161 RM <br /> BUStNrSS SITE ADDRESS 1103 S.Mala St, Rai. (:iTY Manteca,CA 95337 <br /> Roo. <br /> . <br /> .;.: :::.'•..:::......... SPILL:CO.. . OUANa: ' AN•Uls� UDS';: ::;:;::':'r;;`:::::'':::::;:::;:::,:.•::,::..:::....:.:..•....:...... ........ <br /> This plan addresses unauthorizod releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-oft;etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> I Any release to secondary containment will be pumped or othcrwiso removed within a time consistent with the ability ofthc sccondaay containment system to <br /> contain the hazardous material,but not grew=than 30 calendar days,or sooner if required by the local agency.Recovered hazardous materials,unless still <br /> suitable for their intended use,will be managed as hazardous waste. <br /> > Absorbent material will be used to contain and clean rip manageable spills of hazardous mumrials.Absorbent material may be reused until it becomes too saturated <br /> to be effective.It will then be managed properly.Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. <br /> > Facility personnel will determine whether any water removed from secondary containment systems,or h'rom clean-up activity,has been in contact with any <br /> ha rdous material.If the water is contaminated,it will be managed as hitzardous waste.If the water has a petroleum sheen(i.e.,rainbow calor.,),it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colon.Water(hazardous or non- us)from sumps,spill containers,etc. <br /> will not be dispawd to storm water systems. <br /> > We will review secondary containment sy;le s far possible deterioration if any of the fallowing conditions occur: <br /> I, Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardou�s material,other than the prnducdwasstc stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> 1'yr tainnlent. <br /> •.. <br /> released„ uctlwaaste,�d the added malarial or resulting material from such a combination is not compatible with secondary...»:.::con : . <br /> iiT::SPiLL:COEVTROL :.GL.-EAN-UF•.E .LT11'JV[ENT.....: :. :.:..: .:: . . . <br /> PERIODIC MAINTENANCE:Spill control and clean-up cquipmem kept permanently on-site is listed in the facility's Ha rdogs Materials Business Flan.This <br /> equipment is inspected at least monthly,and atter each user,supplies are replenished as needed.Defective equipment is repaired or replaced as neccsswy. <br /> EQUIPAIENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE.ff NEEDED:(Complete only if applicable) <br /> F.QUIFNIENT LOCATION AVAILABILITY <br /> ECS Spill Kit:Oil Absorbent Ins Rio leo. K30 <br /> and Pads On-Sate Saf ne One-Time Use <br /> ECS Spill Kit:Motor Fuel Absorbent R11 azo Ieaa. <br /> Booms and Padsite� _ On-Site Safety Zone One-Time Use <br /> ... R12 R2Y. R32 <br /> ECS Spill Kit: -1 2 On-Site Safety Zone S Callon Facts,Stftk <br /> Ria. R23. R33 <br /> Rho. R24 R34. <br /> _... Ras. R25. 104, <br /> RESPONSIBLE-.17 N (JdE..,;- ONSr:; ;•);;i?.'.•::ii•::7:•i'.;'::�::.'::•: ::; 1:;�::•:: �'::'1!: r.•`.1:`::':5:;:;;';;;'.'r':::'::'i:':`r:<;''•�•:'; <br /> THE FOLLOWING PERSON(S).:.:..,;,.... ......'.::..:..:...S •.:. <br /> A`4iNf <br /> IBJ RESPONSIBLE FOR AUTHORIZING ANX WORK NECESSARY UNDER THIS RESPONSE F[.AN: <br /> NAME CheVron MaintelMinCe DbRAUh Ito. TITLE Help Desk 866-845-4254 <br /> NAME Chevron Emergeng Information Center <br /> R41. TJTIX CEiC 800-231-0623 R51. <br /> NAME: ash <br /> NAM1F, Rua. TITLE R33. <br /> V::'. .TI2ECT:;H, <br /> This information is required only when the presence of the hazardous substaxice can not be verified directly by the monitoring method used(e.g.,where liquid level <br /> measurements in a tank annular space or secondary piping arc used as the basis for leak determination). <br /> TI Ir-FOLLOWING STEPS W ILL BE TAKEN TO VER IFY"l'HE PRESLNCE OR ABSRFICH OF HAZARDOUS SUBSTANCE IN THE SHCO'NDARY <br /> CONTAINMMqT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE; R60. <br /> The afftted UST System will be shut dowel for a third party precision tests)m verify and isolate if a release has occurred, <br /> hwfwr"(9/24/04)-113 <br /> too�i ANUXOO 813aa011d X011AaH3 0992zt9296 XVa 93:2T 9TOZ/OT/T0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.