SWRCB,January 2002 Page of > <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Pressure Gauges in PSI/Nitrogen Equipment Resolution: 1110-15 PSI <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: Approx. 65' Approx.65' Approx.60' Approx.60' <br /> Product Stored: Diesel Diesel Diesel Diesel <br /> Method and location of Test boot at STP#I Test boot at STP#I Test boot at STP#2 Test boot at STP#2 <br /> piping-run isolation: <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:10 9:10 8:30 8:30 <br /> Initial Reading(Rj): 3.3 Psi 3.4 Psi 3.5 Psi 3.4 Psi <br /> Test End Time: 10:10 10:10 9:30 9:30 <br /> Final Reading(RF): 3.3 Psi 3.4 Psi 3.5 Psi 3.4 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RI): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test,Result R Pass ❑Fail ;' X lixass ( atl, X Pass ❑Fail X Pass Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Initial loss and bubbles due to old glue on primary pipe for Tank#1, 15K, Secondary Pipe Runs#1 and#2. <br /> Readjusted clamps to rear of boots and obtained tight seal. <br />