Laserfiche WebLink
Nov 20 09 10:09a 209-367-5424 p.5 <br /> SWRCB,January 2002 pap of <br /> 6. PIPING SUMP TEPG <br /> Test Method Developed By. 0 SUMP mamxfaatur" 0 Industry Standard I Engineer <br /> Q Othw(Spec') <br /> Test Used: 0-11ressure 0 Vacuwn 'c <br /> 0 Other(Sped) I_ ' <br /> Test Equipment Used: C,4j mg 11 I—eWC L. t f CGl nT i ent ResOlutlOA: <br /> jv"imL T 1 t,. <br /> 9,Q , <br /> Sump#�,� Samp# Sump 4 ump# <br /> Stunp Diameter: r rr <br /> SUMP thl, 3 ,t 3 3 <br /> Stump Material: S G►j� ll�,y» rrs� <br /> Height Ecom.Tank Top to Top of l 3 r� <br /> Hi Penetration: G� <br /> Height from.Tank TOP to /1 r�f f <br /> Electrical penetration: p� ! <br /> Condition of sump prior to testing- <br /> Portion of sump,Tested. <br /> Does turbine shut down when <br /> sump Sensor detects liquid(both ❑Yes O No 0 Yes 0 N 0 es ONA OYes. ❑NA <br /> pwactaQ( naterL <br /> Turbine shutdown nse time A" <br /> shutdown? for fail-safe O Yes O No 0 Yes ®No A 0 No ONA 0Yes ®NA <br /> Was W-safe to beO Yes O No A OYes ®No XNA OYA1❑No ONA OYes E ONA <br /> Wait thne ' 9 <br /> P <br /> test j d n-�►:re.ae�•-� a+w <br /> Test Start Tian: ([= d 5 [O®5 <br /> Reading OW: <br /> Test End'Time: <br /> Final Rmding(RF), Flt.-,-l- <br /> Test Duratiom 3o l/?ilue?^ S 36 MrkN ' <br /> Cbenge in Reading(RF-": AJO¢14 Po e <br /> Pass/Fail Threshold or Criteria: , Q S' 3'��• - S' E w%— <br /> TestResult-. ass i7 Fail 0 Fall Pass ❑ it' ❑ Pass ❑ it <br /> Was r removed for testing'? '' Yes 0 No 0 NA es ©No INA Cftes 0 No dtiA 0 Yes 0 No 0 A <br /> Was sensor properiy replaced and es 0 No O NA es 01-To ONA Yes. O No DAA O Yes O No. ❑ <br /> verified 'ol after!E!LuW PO <br /> Comments (dncdude irejvrsaatdon on Mks made prior to testd mzau reaonrrnertded fvdlotwup added tests) <br /> °If the entire depth of the sump is not tested,specify how much was tested. If the answer to an of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LC--160) <br />