My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0504967
>
COMPLIANCE INFO_1989-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:40:41 PM
Creation date
6/3/2020 9:58:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2013
RECORD_ID
PR0504967
PE
2361
FACILITY_ID
FA0006440
FACILITY_NAME
SHERIFFS OPERATIONS CTR #2
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
BLVD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504967_7000 N MICHAEL CANLIS_1989-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 14, 2008 <br />San Joaquin County <br />Environmental Health Department <br />600 East Main Street <br />Stockton, California 95202-3029 <br />Joseph Bagley <br />Bagley Enterprises, Inc. <br />2370 Maggio Circle #4 <br />Lodi CA 95240 <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Re: Sheriff's Operations Center #2 <br />7000 N Michael Canlis Blvd <br />French Camp CA 95231 <br />DIRECTOR <br />Donna Heran, REHS <br />ASSISTANT DIRECTOR <br />Laurie Cotulla, REHS <br />PROGRAM COORDINATORS <br />Carl Borgman, REHS <br />Mike Huggins, REHS, RDI <br />Margaret Lagorio, REHS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />The San Joaquin County Environmental Health Department (EHD) has completed the <br />review of the application for permit (SR0053069) to replace the annular sensor in the North <br />UST. The permit has been approved with the following conditions: <br />1. Contact the Fire Department and San Joaquin Valley Air Pollution Control District for <br />applicable permits. <br />2. Qualified service technicians must possess or work under the direct and personal <br />supervision of an individual physically present at the work site who possesses all of the <br />following: <br />a. One of several permissible valid, current contractor's licenses issued by the <br />Contractors State License Board (may be issued to the installation company), and <br />b. All valid, current California UST certificates issued by the International Code <br />Council (ICC), that are applicable to the work being performed, and <br />c. A valid, current certificate of training from the manufacturer(s) of the <br />component(s) being tested, repaired, or serviced. <br />and <br />d. Each person installing or testing any component must hold a certificate of training <br />from the manufacturer of that component. <br />3. All components installed must be certified by an independent testing organization and <br />bear the appropriate mark as required by the independent testing organization. <br />4. All monitoring equipment must be approved and listed in the State Water Resources <br />Control Board's Local Guidance Letter 113:"List of Leak Detection Equipment and <br />Methods for Underground Storage Tanks." <br />5. Contact Michelle Henry (953-7699) to arrange the following inspections appointments <br />(a 48-hour notice is required for inspection appointments): <br />a. Verify functionality of the annular sensor. <br />6. Complete and submit a copy of a UST Installation Certificate of Compliance (Former <br />Form C) for the North UST tank no later than 30 days after work is completed. <br />8. This permit expires 180 days from the approval date. <br />9. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />
The URL can be used to link to this page
Your browser does not support the video tag.