My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0504967
>
COMPLIANCE INFO_1989-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:40:41 PM
Creation date
6/3/2020 9:58:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2013
RECORD_ID
PR0504967
PE
2361
FACILITY_ID
FA0006440
FACILITY_NAME
SHERIFFS OPERATIONS CTR #2
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
BLVD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504967_7000 N MICHAEL CANLIS_1989-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB. January 2002 <br />tl► 1 " � 1.; <br />Page 3 of 7 <br />Test Method Developed By: <br />Engineer <br />[ ] Piping Manufacturer [&;Industry Standard <br />[ ] Other (Spew) <br />[ ] Professional <br />Test Method Used: <br />[X] Pressure [ ] Vacuum [ ] Hydrostatic <br />[ ] Other (Specify) <br />Test Equipment Used: Pressure Gau' a ui ment Resolution: 0.20 <br />Piping inPiping Run # Piping Run <br />Piping Pun <br />Piping Run # <br />Gen Return <br />Piping Material: <br />FRP <br />Piping Manufacturer: <br />mi <br />Piping Diameter: <br />311 <br />Len of Pi ing Run: <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />10-15 <br />Initial Readin 1 <br />4 PSI <br />Test End Time: <br />11:15 <br />Final Reading <br />60 min <br />Test Duration: <br />0 <br />Chane in Reading -RI <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />j Pass [' Fait <br />::....p <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Repaired secondary pipe with A.O. Smith fitting and glue <br />called for inspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.