Laserfiche WebLink
SWRCB. January 2002 <br />tl► 1 " � 1.; <br />Page 3 of 7 <br />Test Method Developed By: <br />Engineer <br />[ ] Piping Manufacturer [&;Industry Standard <br />[ ] Other (Spew) <br />[ ] Professional <br />Test Method Used: <br />[X] Pressure [ ] Vacuum [ ] Hydrostatic <br />[ ] Other (Specify) <br />Test Equipment Used: Pressure Gau' a ui ment Resolution: 0.20 <br />Piping inPiping Run # Piping Run <br />Piping Pun <br />Piping Run # <br />Gen Return <br />Piping Material: <br />FRP <br />Piping Manufacturer: <br />mi <br />Piping Diameter: <br />311 <br />Len of Pi ing Run: <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />10-15 <br />Initial Readin 1 <br />4 PSI <br />Test End Time: <br />11:15 <br />Final Reading <br />60 min <br />Test Duration: <br />0 <br />Chane in Reading -RI <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />j Pass [' Fait <br />::....p <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Repaired secondary pipe with A.O. Smith fitting and glue <br />called for inspection <br />