Laserfiche WebLink
SWRCB. January 2002 <br />1. *1 V WE <br />II&I 1Y.1 W I W M 9 * <br />Page 3 of 7 <br />Test Method Developed By: Piping Manufacturer Industry Standard Professional <br />Engineer <br />Other (Specify) <br />Test Method Used: Pressure Vacuum Hydrostatic <br />[ ] Other (Specify) <br />Test Equipment Used: Pressure Gauge uiement Resolution: 0.20 <br />75 <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Piping Run # <br />Dajier SUp <br />Piping Run # Piping Run # Piping Run Piping iun <br />BoilAr GAn Rp-t <br />Pi in Material: <br />FRP <br />FRE ERP <br />Pi in Manufacturer: <br />A 0 Smith <br />Piping Diameter: <br />Len of Pi in Run: <br />Product Stored: <br />diggel <br />diesa1___dJAAgj diese.1 <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />startinE test: <br />Test Start Time: <br />10 * 14 <br />10-14 10*34 <br />Initial Readin& (RI) <br />4 psi <br />4 PSI 4 4—PS1. <br />Test End Time: <br />Final Reading QK: <br />pb9i <br />A—RaL 4 RSI 9 <br />Test Duration: <br />lar <br />I hr 1 hr I hr <br />Change in Reading (Ef-RI) <br />A Pq T A-rrvn <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />YJ Pass Fail,jl'-Pass�J: <br />.......... <br />Pk"AA' fFill'. <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />