My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0504967
>
COMPLIANCE INFO_1989-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:40:41 PM
Creation date
6/3/2020 9:58:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2013
RECORD_ID
PR0504967
PE
2361
FACILITY_ID
FA0006440
FACILITY_NAME
SHERIFFS OPERATIONS CTR #2
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
BLVD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504967_7000 N MICHAEL CANLIS_1989-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.Nov 06 03 02:37p G t. Bldgs. <br />(2g&)468-4757 p.4 <br />WRIT'T'EN MONITORING ANIS RESPONSE PLAN <br />UNDERGROUND S'T'ORAGE T ANIS MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br />conditions of the operating pernut. The permit holder must notify Environmental Health Department, (209) 468-3420 <br />within 30 days of any changes to the monitoring procedures, unless required to obtain approval or a peflnit before making <br />the change. Required by CCR 2632 (d) and 2641 (h). <br />EACILITYNAME Sheriff's 9perations Ctr. & jail Com lex DATE 11-6-03 -_ <br />FACILITY ADDRESS 7000 Michael N Cauli.e Blvd.. Frencb Camp. CA 95231 <br />1.Name(s) and Title(s) of the people responsible for perfurrning the monitoring and/or maintenance <br />Bob Cawelti, Dist. Maint. & Const. <br />Tom Valtierra, Electrician <br />2 -Describe the frequency of performing the monitoring for: <br />TANKS Continuous <br />pIpMU^ CVLYtintIOU5 <br />3.Describe the location(s) of where the monitoring will be performed. ie., location of sensors <br />Building 16, Central 1'L ,nt, L"mereenc enerator equipment ro m. <br />4. Describe the following Equipment for each underground storage tank. <br />Nance and Model of Monitoring Panel Universal Sensors & Devices, Inc. -- Mod. LA -R4 <br />Name and Model of Line Leak Detectors N/A <br />Name and Model of Annular Sensors Universal Sensors & Devices, Inc. -- Mod. LALS-1 <br />Name and Model of Piping Sensors Universal Sensors & Devices, Inc. -- Mod. LAVS-1 <br />Name and Model of Dispenser Sensors IV a <br />Type of overfill prevention <br />5 -Do the Turbine Sensors and Dispenser Part Sensors shut down the turbine? Yes 0 No [� N/A <br />Does the turbine shut down if a sensor is disconnected? Yes 0 No 0 N/A <br />Does the turbine shut down is the monitoring panel loses power? 'Yes 0 No C] N/A <br />6. How will the alarm history and subsequent maintenance be recorded? <br />In t•hp. plant EneineerinQ repair and maintenance computer located at,the Plant <br />Engineerin Office at the Sheriff's Central Services Bldg. <br />7 -Maintenance of the monitoring equipment must be performed at least once every 12 months. <br />Describe the preventive maintenance schedule and recording for the monitoring equipment. What month will <br />annual monitoring certification be performed in? Annually _ October <br />Note. For new installations the secondary containment ntust be tested 6 months after installation. All secondary containment systems <br />must be Lusted once eery 36 months with initial testing performed before January 1, 2003, <br />g. Describe the training necessary for the operation of UST system, including piping, and the monitoring <br />Equipment. Current as -bili 1 t drawings and 0 erator' s Manual _ <br />IAUnit IIAUS7�monitorinLVIWI.tloc <br />4/'P-003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.