Laserfiche WebLink
F. In -Tank Gauging / SIR Eq neat: <br />U Check this box if t auging is used only for inventory control. <br />deck this box if n , rk gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perforin leak detection monitoring. <br />Complete the following checklist: <br />D Yes O No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />O Yes O No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes O No* Was accuracy of system product level readings tested? <br />❑ Yes O No* Was accuracy of system water level readings tested? <br />❑ Yes O No* Were all probes reinstalled properly? <br />O Yes O No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and wren these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ('heck this box if l.l,f)s are not installed. <br />Complete the following checklist: <br />D Yes O No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD perform <br />O N/A (Check all that apply) Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ Q.2 g.p.h. <br />❑ Yes f ❑ No* I Were all LLDs confirmed operational and accurate within regulatory requirements? <br />es O No* Was the testing apparatus properly calibrated? <br />es ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />es O No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a <br />❑ N/A <br />❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is <br />❑ N/A or disconnected? <br />O Yes O No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring <br />❑ NIA malfunctions or fails a test? <br />❑ Yes O No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />❑ Yes O No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />8 <br />Page 3 of 3 <br />03/01 <br />