My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0504967
>
COMPLIANCE INFO_1989-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:40:41 PM
Creation date
6/3/2020 9:58:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2013
RECORD_ID
PR0504967
PE
2361
FACILITY_ID
FA0006440
FACILITY_NAME
SHERIFFS OPERATIONS CTR #2
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
BLVD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504967_7000 N MICHAEL CANLIS_1989-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Eq neat: <br />U Check this box if t auging is used only for inventory control. <br />deck this box if n , rk gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perforin leak detection monitoring. <br />Complete the following checklist: <br />D Yes O No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />O Yes O No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes O No* Was accuracy of system product level readings tested? <br />❑ Yes O No* Was accuracy of system water level readings tested? <br />❑ Yes O No* Were all probes reinstalled properly? <br />O Yes O No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and wren these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ('heck this box if l.l,f)s are not installed. <br />Complete the following checklist: <br />D Yes O No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD perform <br />O N/A (Check all that apply) Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ Q.2 g.p.h. <br />❑ Yes f ❑ No* I Were all LLDs confirmed operational and accurate within regulatory requirements? <br />es O No* Was the testing apparatus properly calibrated? <br />es ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />es O No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a <br />❑ N/A <br />❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is <br />❑ N/A or disconnected? <br />O Yes O No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring <br />❑ NIA malfunctions or fails a test? <br />❑ Yes O No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />❑ Yes O No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />8 <br />Page 3 of 3 <br />03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.