Laserfiche WebLink
O'BRIEN•KREITZBERG & ASSOC., INC. <br />SUBMITTAL TRANSMITTAL SUBMIT. NO.: <br />I& ._ <br />Contractor: Walsh Construction Co. ATCN: _ Gree Peterson <br />Subcontractor. J.W. McClenahanCo. ATTN• N.B. McClenahan <br />Specification Section: 15400 Day Tank 15400— Under round Fuel System <br />Kr-YILW AU I IUN GUUE: <br />CM REMARKS: <br />EPTIONS NOTED <br />2. PROVIDE AS CORRECTED 4. INCOMPLETE SUBMITTAL, RESUBMIT <br />3. REVISE AS NOTED AND RESUBMIT S. REJECTED/RESUBMIT AS SPECIFIED <br />Dwg./Item <br />DATED <br />DE RIPTI N <br />9 P3.13 <br />6/26/89 <br />Diesel Oil Storage <br />Tank Detail <br />ALE2.13 <br />6/26/89 <br />CONTRACTOR TO <br />Tank Detail <br />7 P3.13 <br />6/26/89 <br />Diesel & Gasoline <br />Pbmp S tation Detail <br />i�TO <br />A•11 items submitted for review have a <br />six (6) <br />week lead time. <br />CO�4SUMNT-* <br />P VAtl <br />OOw.i . <br />v <br />ow <br />Kr-YILW AU I IUN GUUE: <br />CM REMARKS: <br />EPTIONS NOTED <br />2. PROVIDE AS CORRECTED 4. INCOMPLETE SUBMITTAL, RESUBMIT <br />3. REVISE AS NOTED AND RESUBMIT S. REJECTED/RESUBMIT AS SPECIFIED <br />Dwg./Item <br />DATED <br />DE RIPTI N <br />9 P3.13 <br />6/26/89 <br />Diesel Oil Storage <br />Tank Detail <br />ALE2.13 <br />6/26/89 <br />Gasoline Storage <br />Tank Detail <br />7 P3.13 <br />6/26/89 <br />Diesel & Gasoline <br />Pbmp S tation Detail <br />A•11 items submitted for review have a <br />six (6) <br />week lead time. <br />M1 <br />P VAtl <br />OOw.i . <br />ARCHITECT'S REMARKS: <br />Nam. I out;O a do am tuthortu chanpa to ccnttxt auras or time. If you are authorized to proceed with the --ort IaenHnod to th4 submittal. It � arauroed <br />that r cdaatc to the coctract amount or oomptetion dart k required. It a change in the voort afrwint your contract :mount or [ornptetion date it im 4ed, <br />rwif`r rM ('4t ...,.�r —U. <br />