My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0504967
>
COMPLIANCE INFO_1989-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:40:41 PM
Creation date
6/3/2020 9:58:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2013
RECORD_ID
PR0504967
PE
2361
FACILITY_ID
FA0006440
FACILITY_NAME
SHERIFFS OPERATIONS CTR #2
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
BLVD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504967_7000 N MICHAEL CANLIS_1989-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
up e <br /> STATE OF CAUFOfffA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION FORM B <br /> COMPLETE A SEPARATE FORM FOR TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 6 CHANGE OF INFORMATION F7 7 PERMANENTLY C <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 00 5-�V' <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK 1.D.# B. MANUFACTURED BY: Us <br /> C. DATE INSTALLED(MO/DAYNEAR) flu D. TANK CAPACITY IN GALLONS: <br /> 11.TAN6 COTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> --A-Z <br /> to REG <br /> A. 1 MOTOR VEHICLE FUEL E] 4 OIL C. ❑ UNLEADED <br /> ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM 80 EMPTY E�/1PRODUCT 1b PREMIUM ED 3 DIESEL 4 GASOHOL F-� 7 METHANOL <br /> UNLEADED 5 JET FUEL <br /> 3 CHEMICAL PRODUCT 95 UNKNOWN 2 WASTE <br /> 2 LEADED 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S. <br /> 111. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C.AND ALL THAT APPLIES IN BOX D <br /> A. TYPE OF I DOUBLE WALL F-1 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) 99 OTHER <br /> B. TANK ❑ <br /> I RARE STEEL ❑ 2 STAINLESS STEEL �4 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE " 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ I RUBBER LINED 2 ALKYD LINING 3 EPDXY LINING 4 PHENOLIC LINING <br /> LINING ❑ <br /> 5 GLASS LINING ❑ 6 UNLINED ❑ 96 UNKNOWN 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? YES— NO— <br /> D.CORROSION ❑ I POLYETHYLENE WRAP 2 COATING ❑ 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION a 91 NONE ❑95 UNKNOWN 5-41111.OTHER <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GR ND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION tu'V2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U I SINGLE WALL ALUO DOUBLE WALL A U 3 LINED TRENCH A U 96 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U I BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 6 ALUMINUM A U 6 CONCRETE A U 7 STEEL WI COATING A 8 100% METHANOL COMPATIBLEWIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN U 99 OTHER <br /> D. LEAK DETECTION [-_-] I AUTOMATIC LINE LEAK DETECTOR E 2 LINE TIGHTNESS TESTING3 INTERSTITIAL— [::] 99 OTHER <br /> MONITORING <br /> V.TANK LEAK DETECTION <br /> 1 VISUAL CHECK 2 INVENTORY RECONCILIATION F--] 3 VAPOR MONITORING[] 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> 6 TANK TESTING >0 7 INTERSTITIAL MONITORING ❑ 91 NONE E::] 96 UNKNOWN ❑ W OTHER <br /> - -7 <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAYNR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES = NO <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED&SIGNATURE) "& <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> STA�& COUNTY# JURISDICTION FACILITY# TANK# <br /> .el I <br /> .D.# I❑I 1 1 [0161101010161 <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE M FPER—MIT EXPIRATION DATE <br /> FORM 8 (9-90 THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> OR 1844 <br /> go <br />
The URL can be used to link to this page
Your browser does not support the video tag.