My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0504967
>
COMPLIANCE INFO_1989-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:40:41 PM
Creation date
6/3/2020 9:58:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2013
RECORD_ID
PR0504967
PE
2361
FACILITY_ID
FA0006440
FACILITY_NAME
SHERIFFS OPERATIONS CTR #2
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
BLVD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504967_7000 N MICHAEL CANLIS_1989-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br />Containment _�yem <br />Installation Instruct!r, <br />Publication No: PJP-251 <br />Effective Date: 8-15-88 <br />Supersedes: PJP-250 <br />The Pipe Jacket"Containment System is a secondary containment system for steel or fiberglass primary piping. The <br />system has been designed to be easy and fast to install with only a minimal amount of tools. Once installed, it performs <br />as an air -fight guttering'system around the primary piping system, providing containment from under the dispensers, to <br />the submersible pump, including all swing joints and flex connectors. Any leak in the primary pipe will flow from the high <br />end of the system to a collection sump located at the low end of the system. The Pipe Jacket"' is connected together <br />by using a combination of Stainless steel clamps and Buna-N Compression Seals. All Secondary piping and fitting <br />connections require the use of a rachet wrench or power nut driver. After assembly is complete the Pipe Jacket"' <br />Containment System can be integrity tested and fitted with a continuous monitoring system. The following instructions <br />are required for proper installation. <br />Pre -Installation <br />When designing the primary piping s <br />added size of the larger containment <br />job site which will prevent them from <br />Stage One Assembly <br />n, allow adequate trench sizing and primary pipe spacing to accomodate the <br />and fittings. All Pipe JacketT" components should be stored in an area of the <br />"damaged or lost. <br />Dry -Fit Primary Piping <br />After all Sump/Risers have been installed, (see Sumpfi ' er Installation Instructions) cutting and sizing of the primary <br />ding may begin beyond the Sump/Risers. Cut and dry'lsii the entire primary piping line before cutting and installing <br />any Pipe Jacket"' components. It is important to follow there instructions closely so that all components of the Pipe <br />Jacket'" are in place before final assembly of the primary piping <br />Installing Grommets <br />When exiting the Sump/Riser with contained or non -contained piping <br />install the appropriate size Grommet to seal the exit. Refer to the ;- <br />Sump/Riser Installation Instructions for further information. <br />Note: When exiting the Sump/Riser with 3" primary pipe it is required that J: c, <br />the Sump Adapter component be installed over the primary, just outside <br />the Sump/Riser. The Sump Adapter will accommodate the 4" Grommet and <br />the Telescoping Flex Pipe B. <br />Installing Test Reducers <br />After assembly of the swing joint or flex connector at the submersible pump <br />install the Test Reducer to the primary pipe inside the Sump/Riser. At a later <br />stage of assembly it willjP a clamped to the Telescoping Straight Pipe for <br />sealing -off and air pressure testing of the Pipe Jacket"' containment <br />rstem. <br />
The URL can be used to link to this page
Your browser does not support the video tag.