My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0504967
>
COMPLIANCE INFO_1989-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:40:41 PM
Creation date
6/3/2020 9:58:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2013
RECORD_ID
PR0504967
PE
2361
FACILITY_ID
FA0006440
FACILITY_NAME
SHERIFFS OPERATIONS CTR #2
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
BLVD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504967_7000 N MICHAEL CANLIS_1989-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INN <br />nd the goo fitting to the adjoining piping run. <br />i •+ <br />stage of • access opening. *, <br />Refer , • <br />information. <br />i + <br />• <br />is • • • • extendedInto <br />their fInM <br />rf • • <br />• : • r• • • • <br />• <br />. mary piping, the Telescoping Pipe can be shifted from <br />i •::.. ,fittinginspections. <br />StageThreeAssembly <br />Pipe <br />1•. Jacket Connection <br />may then proceed. All After the primary piping has I been connected, tested and inspecte , conne <br />• •• • • be • s their •• s • <br />• • <br />stage •assembly, <br />•.. , , - <br />this <br />Extending Telescoping Pipe ping Pipe <br />After the primary piping has been tested the pre-installed Telesco <br />should be extended into its final position. For shifting of Telescoping Flex <br />Pipe around primary goo fittings it may be necessary to apply a lubricant, <br />such as liquid ♦.. • or petroleum <br />jamming. it should be noted the Tee Fittings and their compression seals <br />accept <br />. TelescopingStraightPipe. is :: <br />*only <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.