My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CG <br /> 5444 Dry Creek Road <br /> ` Sacramento,CA 95838 <br /> 800-288-2657 <br /> Test Certification <br /> Well Proximity Enhanced Leak Detection (ELD) <br /> Location: CGRS Project No : 6-9557-11915-8232 <br /> Ramos Card Lock Test Date: February 19, 2009 <br /> 10842 Harlan Road CGRS Techs: Tony Oddo <br /> French Camp, CA 95231 <br /> This document certifies that the UST systems listed below at the above referenced location has <br /> been tested and passed the Enhanced Tracer Tight, tightness test. CGRS further certifies that <br /> this test meets the testing requirements for underground storage tank systems as per the <br /> California Code Regulations, Title 23, Chapter 16 Section 2644.1 (a) (1&2). <br /> ELD Test Results <br /> Diesel Primary Containment S ste Pass <br /> CA Tank Tech Signature: 05-1703 2/19/2009 <br /> CA# Date <br /> Reviewed by: �-- <br /> 2/19/2009 <br /> Adam Geiger ect Engineer Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.