Laserfiche WebLink
MONIT&NG' <br />SYSTEM CETI ATI07,,1 ` <br />For Use Use By All Jurisdictions Within the State of California C*,,� t 41� <br />Authority Cited.- Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, Californ`i�` '>Qde of Regulc%i��s <br />r k` <br />This form must be used to document testing and servicing of monitoring equipment. A separate certlficatidn!�he� 6nort must be <br />prepared for each monitoring system control panel by the technician who performs the work. A copy of this form iY1tidbe,�r4vided to <br />the tank system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems <br />within 30 days of test date. <br />A. General Information <br />Si ature: <br />Facility Name: RAMOS OIL <br />Bldg. No.: <br />Site Address: 10842 S. HARLAN RD <br />41:y: FRENCH CAMP <br />Zip: 95231 <br />Facility Contact Person: BRYAN JONSON <br />ntact Phone No.: (916) 371-2570 <br />Make/Model of Monitoring System: INCON TS 1000 <br />Date of Testing/Servicing: OCT 18, 2007 <br />B. Inventory of Equipment Tested/Certified <br />Check the appropriate boxes to indicates ecific equipment ins ected/serviced• <br />Tank ID: DIESEL <br />Si ature: <br />Tank ID: <br />Z In -Tank Gauging Probe. <br />Model: MAG <br />❑ In -Tank Gauging Probe. Model: <br />Z Annular Space or Vault Sensor. <br />Model: FLOAT <br />❑ Annular Space or Vault Sensor. Model: <br />Z Piping Sump / Trench Sensor(s). <br />Model: FLOAT <br />❑ Piping Sump / Trench Sensor(s). Model: <br />Z Fill Sump Sensor(s). <br />Model: FLOAT <br />❑ Fill Sump Sensor(s). Model: <br />Z Mechanical Line Leak Detector. <br />Model: FXIOV / LD2000 <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. Model: <br />Z Tank Overfill / High -Level Sensor. <br />Model: FLOAT <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Other(specify equipment a and model in Section E on Pae 2). <br />❑ Other (specifX equipment e and model in Section E on Page 2). <br />Tank ID: <br />Tank ID: <br />❑ In -Tank Gauging Probe. <br />Model: <br />❑ In -Tank Gauging Probe. Model: <br />❑ Annular Space or Vault Sensor. <br />Model: <br />❑ Annular Space or Vault Sensor. Model: <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Piping Sump / Trench Sensor(s). Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Other (speciLy equipment a and model in Section E on Page 2). <br />❑ Other (specify a ui ment e and model in Section E on Pae 2). <br />Dispenser ID: 14A <br />Dispenser ID: 4-4A <br />Z Dispenser Containment Sensor(s). <br />Model: FLOAT <br />Z Dispenser Containment Sensor(s). Model: FLOAT <br />® Shear Valve(s). <br />Z Shear Valve(s). <br />❑ Dispenser Containment Floats and Chain(s). <br />❑ Dispenser Containment Floats and Chain(s). <br />Dispenser ID: 2-2A <br />Dispenser ID: 5-5A <br />Z Dispenser Containment Sensor(s). <br />Model: FLOAT <br />Z Dispenser Containment Sensor(s). Model: FLOAT <br />Z Shear Valve(s). <br />Z Shear Valve(s). <br />❑ Dis enser Containment Floats and Chain(s). <br />❑ Dispenser Containment Floats and Chain(s). <br />Dispenser ID: 3-3A <br />Dispenser ID: <br />Z Dispenser Containment Sensor(s). <br />Model: FLOAT <br />❑ Dispenser Containment Sensor(s). Model: <br />Z Shear Valve(s). <br />❑ Shear Valve(s). <br />❑ Dis enser Containment Floats and Chain(s). <br />❑ Dis enser Containment Floats and Chain(s). <br />It the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br />guidelines. Attached to the Certification is information (e.g. manufacturers' checklists) necessary to verify that this information is correct and a <br />Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached a copy of the <br />report; (check all that apply): IZ System set-up Z Alarm history report <br />_7Technician Name(print): ROBERT NEIMEYER <br />Si ature: <br />Certification No: 3647353760 <br />License: 803705 <br />Testing Company Name: TANK- TEK ENVIRONMENTAL CORPORATION <br />Phone No: (707) 446-6151 <br />Address: 607 ELMIRA RD, PMB 336, VACAVILLE, CA 95687 <br />Date of Testing/Servicing: <br />OCT 18, 2007 <br />Pagel of 3 <br />Monitoring System Certification <br />