My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The address for submission of the ELD test results to the SWRCB UST Program is: <br />State Water Resources Control Board <br />Division of Water Quality <br />Attention: Kevin L. Graves, P.E.,UST Program Manager <br />ELD Test Results <br />P. O. Box 2231 <br />Sacramento, CA 95812 <br />Local Agency Responsibility: The local agency is responsible for working with the <br />tank owner/operator to approve the program of ELD (testing program plan) submitted by <br />the owner/operator within six (6) months following notification by the SWRCB UST <br />Program. The local agency also must follow-up on the ELD test results and oversee <br />implementation of the recommendations in the ELD test report. <br />LTIVI MMa • r . • • s • • • l - • • t • . I <br />The written plan must include: <br />• A modification/amendment to the existing UST monitoring plan; <br />• Submittal. of standard documentation describing the third -party approved <br />process for implementation of the ELb requirement (often this is a generic <br />document developed by the testing company); and <br />• A signed access agreement between the testing company and the <br />owner/operator to have the ELD test completed or the proposed date that <br />the ELD test will be performed. <br />A program of ELD does not require a site-specific plan developed by the testing <br />company for each UST facility because ELD is a third -party certified UST system "test <br />method" with specific testing guidelines that must be followed in order for the test results <br />to be valid. <br />Which vendors are approved at this time to perform ELD? <br />At this time, we are aware of two vendors who meet all the regulatory criteria to perform <br />ELD. The two vendors are Praxair Services, Inc. (formerly known as Tracer Research <br />Corporation) and Shirley Environmental Testing. Shirley Environmental Testing is an <br />affiliate of Praxair Services, Inc. <br />Contact information for Praxair Services, Inc. is: <br />Praxair Services, Inc. <br />Attention: Michael Krammes <br />3755 North Business Center Drive <br />Tuscon, AZ 85705-2944 <br />Phone: 1-800-394-9929 ext 238 <br />E-mail: michael_krammes@Praxair.com <br />Web: www.Praxair.com/services <br />California Environmental Protection Agency <br />0 Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.