Laserfiche WebLink
ONIT NG SYSTEM CERTI ATION <br />For Use By All Jurisdictions Within the State of California <br />Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations <br />This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be <br />prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to <br />the tank system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems <br />within 30 days of test date. <br />A. General Information <br />Facility Name: RAMOS OIL <br />Bldg. No.: <br />Site Address: 10842 S. HARLAN RD <br />City: FRENCH CAMP I Zip: 95231 <br />Facility Contact Person: BRYAN JONSON <br />Contact Phone No.: (916) 371-2570 <br />Make/Model of Monitoring System: INCON TS1000 <br />I Date of Testing/Servicing: OCT 9, 2006 <br />B. Inventory of Equipment Tested/Certified <br />Check the appropriate boxes to indicate specific equipment inspected/serviced: <br />Tank ID: DIESEL <br />Tank ID: <br />Z In -Tank Gauging Probe. <br />Model: MAG <br />❑ In -Tank Gauging Probe. <br />Model: <br />Z Annular Space or Vault Sensor. <br />Model: FLOAT <br />❑ Annular Space or Vault Sensor. <br />Model: <br />Z Piping Sump / Trench Sensor(s). <br />Model: FLOAT <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />Z Fill Sump Sensor(s). <br />Model: FLOAT <br />❑ Fill Sump Sensor(s). <br />Model: <br />® Mechanical Line Leak Detector. <br />Model: FXI <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />Z Tank Overfill / High -Level Sensor. <br />Model: FLOAT <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Others eci e ui ment ty2e and model in Section E on Pa e 2). <br />❑ Other(specify a ui ment type and model in Section E on Pae 2). <br />Tank ID: <br />Tank ID: <br />❑ In -Tank Gauging Probe. <br />Model: <br />❑ In -Tank Gauging Probe. <br />Model: <br />❑ Annular Space or Vault Sensor. <br />Model: <br />❑ Annular Space or Vault Sensor. <br />Model: <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Others eci equipment a and model in Section E on Page 2). <br />❑ Other(specify a ui ment type and model in Section E on Pae 2). <br />Dispenser ID: 1 - 1A <br />Dispenser ID: 4 - 4A <br />Z Dispenser Containment Sensor(s). <br />Model: FLOAT <br />Z Dispenser Containment Sensor(s). <br />Model: FLOAT <br />Z Shear Valve(s). <br />Z Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />Dispenser ID: 2 - 2A <br />Dispenser ID: 5 - 5A <br />® Dispenser Containment Sensor(s). <br />Model: FLOAT <br />Z Dispenser Containment Sensor(s). <br />Model: FLOAT <br />® Shear Valve(s). <br />Z Shear Valve(s). <br />❑ Dispenser Containment Float(s and Chains . <br />❑ Dispenser Containment Float(s) and Chain(s). <br />Dispenser ID: 3 - 3A <br />Dispenser ID: <br />Z Dispenser Containment Sensor(s). <br />Model: FLOAT <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />Z Shear Valve(s). <br />❑ Shear Valve(s). <br />❑ Dis enser Containment Floats and Chain(s). <br />❑ Dispenser Containment Floats and Chain(s). <br />*If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br />guidelines. Attached to the Certification is information (e.g. manufacturers' checklists) necessary to verify that this information is correct and a <br />Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached a copy of the <br />report; (check all that apply): Z System set-up Z Alarm history report <br />Technician Name(print): ROBERT NEIMEYER Signature: <br />Certification No: 04013868 1 License: 803705 <br />Testing Company Name: TANK-TEK ENVIRONMENTAL CORPORATION I Phone No: (707) 446-6151 <br />Address: 607 ELMIRA RD, PMB 336, VACAVILLE, CA 95687 Date of Testing/Servicing: OCT 9, 2006 <br />Page 1 of 3 <br />Monitoring System Certification <br />