My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g BUSINESS NAME <br />RAMOS OIL - FRENCH CAMP <br />9 <br />10 <br />12 <br />13 <br />14 <br />Identify <br />piping <br />leak <br />monitoring <br />Identify <br />dispenser <br />leak <br />monitoring <br />Monitoring method <br />® sump leak sensors connected to <br />continuous monitoring system <br />❑ discriminating sensor <br />Specify type: <br />® liquid sensor <br />❑ liquid float <br />® mechanical line leak detectors w/ <br />programmed leak threshold of: <br />❑ 0.2 gph ® 3 gph <br />❑ electronic line leak detectors w/ <br />programmed leak threshold of: <br />❑ 0.1 gph ❑ 0.2 gph [:13 gph <br />® line integrity testing by: <br />❑ monitoring system <br />® third party testing <br />❑ other (specify): <br />❑ facility has suction piping only which <br />meets exemption requirements <br />❑ no product or remote -fill piping <br />��Z <br />INCON <br />TANK TEK <br />N/A <br />N/A <br />Monitoring method Specify Manu <br />Company <br />❑ mechanical float in dispenser containment <br />(i.e. Bravo box connected to shear valve) <br />® electronic leak sensor in dispenser <br />containment INCON <br />❑ electronic leak sensor in piping sump <br />monitors dispenser containment drainage <br />❑ visual inspection <br />n no dispensers in system <br />N/A <br />FACILITY # <br />FA0006898 <br />�allouny ma�uoi � <br />FXIDX2 <br />N/A <br />N/A <br />it / <br />Specify Model # / Type Frequency <br />N/A <br />N/A <br />❑ System does not have positive automatic pump shut-off capability. <br />Indicate whether monitoring <br />System has positive € ® Automatic pump shut- ® release is sensed in piping sump ®system is disconnected <br />automaticpump shutoffs................... .._.._....._ .............. .......... ....:.................... ............. ............... <br />capabilities: off will occur ❑ release is sensed in primary piping ®system fails in any way <br />.........................................._........... ..................... .. ._ ...... ....................................... .............. <br />whenever: ❑ release is sensed at dispenser <br />El other: <br />lei i4l;+p►eht,°+ cattort 1 i'estalt ;, <br />19 All components of the monitoring system must be certified for proper operation at least annually; more frequent <br />I; a��la�lattcltt t�f ; <br />(b UtC C71t9i1t testing and certification may be required when designated by a manufacturer. Certification must be, performed <br />by qualified personnel. Examples of equipment requiring annual certification include electronic monitor <br />consoles, probes, sensors, line leak detectors and dispenser meters. <br />2® annually-- in the month of: Company: TANK TEK <br />Indicate equipment <br />....................(_..p............y)............................ ................................... ..................................... <br />............ <br />certification period ❑ other s ecif <br />.........................................................................................................................®.._ <br />Page IMP 2 UST Monitoring Plan <br />DATE <br />Frequency <br />continuous <br />every pumping cycle <br />every pumping cycle <br />❑ <br />:........................... <br />® <br />monthly <br />triennially <br />............ ..... .... .................. ................ ............ <br />annual <br />N/A <br />N/A <br />it / <br />Specify Model # / Type Frequency <br />N/A <br />N/A <br />❑ System does not have positive automatic pump shut-off capability. <br />Indicate whether monitoring <br />System has positive € ® Automatic pump shut- ® release is sensed in piping sump ®system is disconnected <br />automaticpump shutoffs................... .._.._....._ .............. .......... ....:.................... ............. ............... <br />capabilities: off will occur ❑ release is sensed in primary piping ®system fails in any way <br />.........................................._........... ..................... .. ._ ...... ....................................... .............. <br />whenever: ❑ release is sensed at dispenser <br />El other: <br />lei i4l;+p►eht,°+ cattort 1 i'estalt ;, <br />19 All components of the monitoring system must be certified for proper operation at least annually; more frequent <br />I; a��la�lattcltt t�f ; <br />(b UtC C71t9i1t testing and certification may be required when designated by a manufacturer. Certification must be, performed <br />by qualified personnel. Examples of equipment requiring annual certification include electronic monitor <br />consoles, probes, sensors, line leak detectors and dispenser meters. <br />2® annually-- in the month of: Company: TANK TEK <br />Indicate equipment <br />....................(_..p............y)............................ ................................... ..................................... <br />............ <br />certification period ❑ other s ecif <br />.........................................................................................................................®.._ <br />Page IMP 2 UST Monitoring Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.