Laserfiche WebLink
Oct 21 2005 9:07AM <br />V� <br />M <br />HP LRSERJET 3330 <br />P.15 <br />..,tATOR MONTHLY Y INSPECTION <br />9 <br />PAPIRWORK H=KY Y n N/ <br />Monitoring system eot'0cation his been completed within the peat 12 months. <br />DATE <br />O <br />10 <br />Secondary containment tests have been completed within the peat 36 months. LEM <br />11 <br />Spill conminmeot buckets have been tested YAM% the past 12 nxmths. <br />� <br />11 <br />Tank dgbtneas testing was complated within Qts past 12 monN <br />13 <br />Lina tightness testing was completed within the FiYrnonths. <br />l '� <br />14 <br />Other required testingjmaintanance was complated within the required titttaflame, <br />TestlMaini: <br />Te sHMsMtce 0 01 C3 <br />TestlMeht�rtanae: <br />FACEUT %MOM TRATMG <br />N/A <br />15 <br />All lheiilty employees have received the required an-the-job'trainittg within the past year. <br />16 <br />All facility employees hired within the past 30 days have received the tbquireed an-ths job training, <br />Note: Any answer of ON" should be explained In the comment action on the fotlowbe page, and will require follow-up action, <br />Comments: <br />ItamS Requiring Follow -Up Action: <br />5 <br />U <br />r <br />PRINT OUTS <br />T L <br />F.O. BOX 401, W SACRAR+IGNTO, CA 95691 1 <br />000)477-7266 <br />