Laserfiche WebLink
VVR=N MONTrORING PROCEDURES <br />LJNDERGROLTND STORAGE TANK MONITORING PROGRAM <br />111is Mcnitollng program mint be kept at the usr kxation at au ttmes. The information on Thb monitoring <br />program are coaditilions ,of the Operating permit. ne permit bolder must notiEy San Jwquia County <br />Eavironn=ral HWth. DivLaov, phone (209) 4C&3420 widdu 30 days of any dmSes to the monitoring <br />pro=dums, Wdess required to Qbtalu approval before mamag the change. <br />Required by Sections 2632(d) and 2641(11) cM <br />Facility Name Beneto Tank Lines <br />Facfflty Address 10842 So. Harlan Rd, French Camp, CA 95231 <br />A. Describe the frequency of performing the mordtorftW. <br />Tank Continuously <br />Friping, continuously <br />13. What methods and equipment, identified by name and model, wiH be used for <br />performing the monitoring. - <br />Tank incon TS1000 <br />Piping Incon T51000 / RedJacket 116-035 <br />C. Describe the location(s) where the monitoring WM be performed (facility plot plan <br />should r <br />Utility Room <br />D. List the name(s) and title(s) of the people responsflole for performing the moldtord! <br />and/or maintaining the equipment - <br />Roger Liston <br />H. Reporting format for monitoring-, <br />Tank Daily inspection of the monitoring,equipment <br />Inpina Daily inspection of the i�6=itoring equipment <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br />Mainunance must be in accordancewith the manufacturers' maintenance schedule <br />but not less than every 12 months: Daily, sensor alarm check <br />G, Descnbe the tfaLxting necessary for the operation of UST Vstem, including piping, <br />and the mon;toringequipment on-gita manager trained by installation <br />tech. on how the systeM operates <br />