I,& A2. Bed and Backfill (cont.) <br />Approved Gravel <br />Must consist of clean, natural- <br />ly -rounded aggregate with a <br />mix of particle sizes not less <br />than 1/8" or more than 3/4". <br />Approved Crushed Stone <br />or Crushed Gravel <br />Must be washed with angular <br />particle size not less than <br />1/8" or more than 1/2". <br />No more than 3 % may pass No more than 3 % may <br />the #8 sieve. pass the #8 sieve. <br />Dry gravel density must be a Dry gravel density must be <br />minimum of 95 pounds per a minimum of 95 pounds <br />cubic foot. per cubic foot. <br />A3. Pre -Installation Testing <br />DO NOT PRESSURIZE TANKS OVER 5 PSI. <br />TANK DAMAGE CAN RESULT. <br />• All tanks must be tested for leaks prior to installation. <br />Use the visual air/soap test: <br />• Visual Air/Soap Test - to be performed on all tanks. <br />❑ Warm weather soap solution - 5 gallons of water <br />with 8 ounces of household dishwashing detergent. <br />❑ Freezing conditions soap solution - substitute 1 gallon of <br />automotive windshield washer solution for 1 gallon of <br />water. <br />❑ Cover entire tank outer surface with soap solution.* <br />❑ Cover all fittings with soap solution. <br />❑ Carefully inspect for leaks as indicated by bubbles. <br />*Exception - double-wall tanks with annular space filled. <br />• In the unlikely event a tank leak is discovered, discontinue <br />the installation and immediately call the Owens-Corning <br />Field Service Department to schedule a repair. See phone <br />numbers on page 2. <br />Testing Single -Wall Tanks <br />These tests must be performed before installing tanks: <br />• Remove fitting plugs. <br />• Apply pipe dope and reinstall fitting plugs. <br />• Pressurize tanks. <br />❑ 4' through 10' diameter tanks to 5 psi maximum. <br />❑ 12' diameter tanks to 3 psi maximum. <br />❑ Use a pressure relief valve. <br />• Soap the tank and carefully inspect for leaks as indicated <br />by bubbles. <br />• Maintain test pressure and continue inspection for at least <br />30 minutes. <br />DO <br />• Use an air gauge with 1/4 or 1/2 lb. increments. <br />• Make sure you understand these instructions. If in doubt, <br />call the Owens-Corning Installation Manager in Toledo at <br />(419)-248-7317. <br />DO NOT <br />• Approach endcaps or manways while tanks are under <br />pressure. This could result in personal injury. <br />• Lift or hoist a tank under pressure. This could result in <br />personal injury. <br />• Use a vacuum gauge. <br />Testing Double -Wall Tanks with Dry <br />Annular Space <br />This section is for tanks which do not have monitoring tracer <br />fluid installed. If tank arrives at site with monitoring fluid <br />installed, use instructions for Double -Wall Tanks with <br />Annular Space Filled on page 4. <br />For All Tests: <br />DO <br />• Install air gauge at the fitting where the air pressure <br />hose is connected to the tank. <br />• Install a second gauge at the other monitoring fitting. <br />• Use an air gauge with 1/4 or 1/2 lb. increments. <br />DO NOT <br />• Lift or hoist a tank under pressure ( to avoid potential <br />injury). <br />Outer Wall Test <br />Step #1 <br />• Close manifold valve between primary tank and annular <br />space. <br />• Pressurize primary tank to 5 psi maximum. <br />• Use a pressure relief valve. <br />Do not connect the air supply directly to the monitoring <br />fitting or tank damage will result. <br />Continued on next page. <br />i/4 <br />1 <br />3/4 <br />1/2 <br />-1/4 <br />Approved Gravel <br />Must consist of clean, natural- <br />ly -rounded aggregate with a <br />mix of particle sizes not less <br />than 1/8" or more than 3/4". <br />Approved Crushed Stone <br />or Crushed Gravel <br />Must be washed with angular <br />particle size not less than <br />1/8" or more than 1/2". <br />No more than 3 % may pass No more than 3 % may <br />the #8 sieve. pass the #8 sieve. <br />Dry gravel density must be a Dry gravel density must be <br />minimum of 95 pounds per a minimum of 95 pounds <br />cubic foot. per cubic foot. <br />A3. Pre -Installation Testing <br />DO NOT PRESSURIZE TANKS OVER 5 PSI. <br />TANK DAMAGE CAN RESULT. <br />• All tanks must be tested for leaks prior to installation. <br />Use the visual air/soap test: <br />• Visual Air/Soap Test - to be performed on all tanks. <br />❑ Warm weather soap solution - 5 gallons of water <br />with 8 ounces of household dishwashing detergent. <br />❑ Freezing conditions soap solution - substitute 1 gallon of <br />automotive windshield washer solution for 1 gallon of <br />water. <br />❑ Cover entire tank outer surface with soap solution.* <br />❑ Cover all fittings with soap solution. <br />❑ Carefully inspect for leaks as indicated by bubbles. <br />*Exception - double-wall tanks with annular space filled. <br />• In the unlikely event a tank leak is discovered, discontinue <br />the installation and immediately call the Owens-Corning <br />Field Service Department to schedule a repair. See phone <br />numbers on page 2. <br />Testing Single -Wall Tanks <br />These tests must be performed before installing tanks: <br />• Remove fitting plugs. <br />• Apply pipe dope and reinstall fitting plugs. <br />• Pressurize tanks. <br />❑ 4' through 10' diameter tanks to 5 psi maximum. <br />❑ 12' diameter tanks to 3 psi maximum. <br />❑ Use a pressure relief valve. <br />• Soap the tank and carefully inspect for leaks as indicated <br />by bubbles. <br />• Maintain test pressure and continue inspection for at least <br />30 minutes. <br />DO <br />• Use an air gauge with 1/4 or 1/2 lb. increments. <br />• Make sure you understand these instructions. If in doubt, <br />call the Owens-Corning Installation Manager in Toledo at <br />(419)-248-7317. <br />DO NOT <br />• Approach endcaps or manways while tanks are under <br />pressure. This could result in personal injury. <br />• Lift or hoist a tank under pressure. This could result in <br />personal injury. <br />• Use a vacuum gauge. <br />Testing Double -Wall Tanks with Dry <br />Annular Space <br />This section is for tanks which do not have monitoring tracer <br />fluid installed. If tank arrives at site with monitoring fluid <br />installed, use instructions for Double -Wall Tanks with <br />Annular Space Filled on page 4. <br />For All Tests: <br />DO <br />• Install air gauge at the fitting where the air pressure <br />hose is connected to the tank. <br />• Install a second gauge at the other monitoring fitting. <br />• Use an air gauge with 1/4 or 1/2 lb. increments. <br />DO NOT <br />• Lift or hoist a tank under pressure ( to avoid potential <br />injury). <br />Outer Wall Test <br />Step #1 <br />• Close manifold valve between primary tank and annular <br />space. <br />• Pressurize primary tank to 5 psi maximum. <br />• Use a pressure relief valve. <br />Do not connect the air supply directly to the monitoring <br />fitting or tank damage will result. <br />Continued on next page. <br />