My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />UST: SYSTEM <br />PRINTSET <br />INFORMATION <br />CAPACITY <br />®1 00 0 <br />MANUFACTURER <br />1. <br />COMPOSITION <br />Four complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br />MODEL <br />PRODUCT <br />2. <br />Plans drawn to scale in non -erasable print. <br />3. <br />U.L. LISTED <br />Plot plan to show location and number of tanks. <br />4. <br />Tank cross-sectional diagram included on prints submitted. <br />5. <br />Detail of tank, piping system, excavation and cover. <br />6. <br />J_/ <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br />Article 3, Sec. 2631 (r) & 26351 <br />7. <br />Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br />8. <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)] <br />9. <br />Tightness Test (NFPA 30) is required on both primary (10) and secondary (20) containment systems before covering. <br />[Section 2635 (b) (6) & (7)] <br />10. <br />Double walled tanks using pressure or vacuum testing to monitor the anular space. [Section 2635 (b) (7)3 <br />11. <br />NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br />be submitted directly to PHS/EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (g)] <br />12. TANK COMPOSITION <br />TANK # <br /># # # # # <br />CAPACITY <br />®1 00 0 <br />MANUFACTURER <br />c, <br />COMPOSITION <br />MODEL <br />PRODUCT <br />CORROSION PROTECTION <br />U.L. LISTED <br />COMPATIBILITY WITH 100% <br />METHANOL <br />13. TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic. <br />B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)] <br />C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br />(1) Striker plate dimensions and materials. <br />(2) Striker plate under all accessible openings. <br />(3) Installation instructions require an air test and soap bubble test prior to installation. <br />_ D. Non -clad steel tank [Section 2635 (b)] <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Approved by a corrosion engineer or N.A.C.E. technician. <br />(3) Document stating inspection method and frequency (minimum semi-annual inspection requirement). <br />N <br />
The URL can be used to link to this page
Your browser does not support the video tag.