My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 11:43:46 AM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Return to compliance S. Harlan <br /> Item 104:Tank manufacturer was changed in CERS from Xerxes to containment solutions <br /> Item 105:Tank monitoring plan was changed in CERS from ATG leak detection to reflect the site that is <br /> using the annular sensor for leak detection on the tank. The leak detection for the piping was changed <br /> to continuous monitoring using the VR208 sensor in the turbine sumps.The leak detector was changed <br /> from LD2000 to 99LD2000.Joy Kachadorian was removed from CERS and replaced with Lauren Takos. <br /> Item 201:All paperwork for the previous three years has ben copied and left onsite. <br /> Item 215: current permit to operate has been left onsite. <br /> Item 310: sensor L5 was not included in shut down of the diesel turbine. Sump was found to be dry on <br /> inspection and programing was changed to include L5 on the shutdown of the diesel turbine. L5 was <br /> tested post programing change and functioned properly. <br /> Best Regards <br /> Steven Richardson. <br />
The URL can be used to link to this page
Your browser does not support the video tag.