My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
437
>
2300 - Underground Storage Tank Program
>
PR0506406
>
COMPLIANCE INFO_1996-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 3:00:08 PM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2008
RECORD_ID
PR0506406
PE
2361
FACILITY_ID
FA0002313
FACILITY_NAME
WILSON WAY CHEVRON
STREET_NUMBER
437
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15113052
CURRENT_STATUS
01
SITE_LOCATION
437 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506406_437 N WILSON_1996-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e , Feb 02 07 12: 27p Wils Way Chevron 2099426 06 p. 2 <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION L NEW PLAN r_12.CHANGE OF INFORMATION atal. <br /> PLAN TYPE Er MONITORING IS IDENTICAL FOR ALL LISTS AT THIS FACILITY. Moa. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S). <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agencv Use Only) - - <br /> ntn3. <br /> FACILITY NAME wt Lsarj w.11 C t ;J <br /> FACILITY SITE ADDRESS t}3,+-py, t stL&tyj yy:� it Mao. CITY S,-�f�� Mos' <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Mab• <br /> accordance with the equipment manufacturers'instructions,or anti 11 ,whichever is more frequent. Such work must be performed by qualified personnel. <br /> M07. <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLY ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(Le.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form Hazardous Materials Business Plan map,etc.)which shows all required information include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mta. <br /> V1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> L>B <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM Mtt, <br /> PANEL MANUFACTURER: E6b!--y_4Ca7 M13. MODEL#: 'ILS 34;c, M13, <br /> LEAK SENSOR MANUFACTURER: Vcl3a h114. MODEL#(S): 7'r`�3 1� 'f y� M13. <br /> 2..AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKS) <br /> PANEL MANUFACTURER: M16. MODEL#: M17' <br /> IN-TANK PROBE MANUFACTURER: oT Mla MODEL#(S): M19. <br /> LEAK'FEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY M20. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify). M21. <br /> PROGRAMMEDTESTS: ❑ a.0.1 h. ❑ b.02 h. ❑ c.OTHERS cif M22. 1423. <br /> g.p.h. g.p.h. (Specify): <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: C] a.36 HOURS ❑ b.60 HOURS M25' <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY'. a.ANNUALLY L] b.BIENNIALLY ❑ c.OTHER(Specify): Mar. M27. <br /> ❑ <br /> 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(mgwrmayencyapproval) <br /> MZx. <br /> ❑ 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> Yl.CONTINUOUS ELECTRONIC MONITORING,917 lfR <br /> PIPING SUMP(S) ENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: Ra.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM Mat. <br /> PANEL MANUFACTURER: � rl'C M32. MODEL#: 1LS- ISO M33, <br /> LEAK SENSOR MANUFACTURER: V i�-ilii i M34. MODEL#(S): `iat'ap- � Mas. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? Ira.YES ❑ b.NO MN <br /> �� WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? [/a.YES (Ib.NO 1437. <br /> Q 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED t^ N� Mas <br /> MLLD MANUFACTURER(s): �= Pea M1t3R MODEL#(S): <br /> ❑ 3.ELECTRONIC LINE-LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Moa. MODEL#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO 1,143. <br /> WTI I-ELLD FAILUREIDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES C] b.NO Mao. <br /> 4.INTEGRITY TESTING <br /> TEST FREQUENCY: �NNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) Mas. Mats. <br /> ❑ S.VISU.AL MONITORING DONE. ❑ a.DAILY ❑ b.WEEKLY* ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** M47. <br /> *Requires agency approval *"Allowed for mnitoring of buried emergancp generator fuel piping only per HSC W2111.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTTON FROM MONITORING PER 23 CCR§2636(ax3) <br /> ❑ 7 NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ <br /> 99.OTHER(Specify) M48. <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.