Laserfiche WebLink
E <br />E <br />S�.IRCB, January 2002 1 1 Page _ of <br />6. PIPING SUMP TPTIN <br />Test method Developed By: Andustry Swndard 171 Professional Engineer <br />- SUMP Manufacturer L <br />d' Other (.tI <br />1 Test Method Used: 0 Pressure El Vacuum <br />0 Other (Sped/ <br />Test Equipment Used: <br />Equipment Resolution: <br />SUMP 7 <br />SUMP # <br />7 <br />SUMP SUMP <br />Sump Diameter <br />Sump Depth: <br />Sump Material: i Si <br />Height from Tank Top to Top of tt <br />Highest Pip!�ig Penetration. <br />a1 <br />Height from Tank Top to Loxiest it <br />Electrical Penetration: <br />Condition of sump prior to -testing, <br />Portion of Sump, Tested' <br />27 <br />Does hirbuie shut doltit when <br />sump sensor detects liquid (both a<S 01140 ONA <br />MLhIct and -,vater)?' <br />ff'�es 0 No 0 NA <br />0 -Yes 0 No LI NAD <br />Yes ONo DNA <br />I <br />Turbine shutdown response time 20 5 e c- <br />-20 <br />Is systent programmed for faid-salk NA <br />sluttdimvu?' 2rfes to No -L� <br />i es D No c NA <br />OYe G ONA <br />s <br />GYes C -No SG NA <br />Was fail-safe verified to be - NA <br />0 Yes 0 No <br />operation. <br />0 Yes 0 No EI<A <br />Q Yes 0, No 0 NA <br />DNA <br />Wait time be!ftvccn apptying <br />pressure/vacuum/water and starting 1 0 <br />test: <br />Test Start Time: 100p <br />166.0 <br />ItAtiai Reading (n: 2L le <br />-17 "e <br />Test End Time: 1100 <br />Final Reading (11F): <br />Test Duration: <br />f- <br />Change in Reading (RF -R4); <br />Pass/Fail Threshold or Criteria: 04 <br />3= <br />Test Resutt: ePus 0 Fail <br />!�--Paw 0 Fad <br />0 Pan 0 Fail <br />0 Pus 0 Fad <br />Was sensor removed for k-AmW? es D No 0 NA <br />ONo DNA <br />O' Yes ONo DNA <br />ClYes 01,b DNA <br />Was sensor properly replaced and -r.Y* es 0 No 0 NA <br />E functionai after testing? M <br />As 0 No ON -A <br />0 Y 0 1% <br />'es D No O'NA <br />COMMentS - (include information on repairs inazk prior to testing; and recommended follow-up ,lbrfailed tests) <br />if the entire depth of the sump is not tested- ipecify how much alas tested. ff the ans-carer to any of Elie questions indicated with an <br />asterisk (*)' is -NC" or "NX', the entire sump must be tested. (See SWRCB LG -160) <br />