Laserfiche WebLink
Mar 17 04 01:26p <br />SWRCB, January 200-2 <br />RAWDER SINGH <br />209#1 0142 <br />Page Of <br />SECONDARY PIPE TE-STLNG <br />I Test Method'.DevelODed Bv: Piping Manufacturer �dusay Standard E Professionai Enaincer <br />Other (Svecifv) <br />Test Method Used: pressure L] Vacuum E- Hydrostatic <br />�i Other (Specify) <br />Test Equipment 'Used: EquipmerrL Resolution. <br />Piping Run 4 <br />Piping Run # 2, Piping Run # Piping Run # <br />Piping Material: <br />Piping Manufacturer* <br />Piping Diameter: <br />Langth of Piping <br />Product Stored'. <br />Method and location of <br />isolation: <br />—I <br />In <br />pimng-nm <br />Wait time between applying <br />pressure/vacuumfWater and <br />tesl: <br />1 4x1. Start 'i3uYe. <br />C! 7- <br />Initial Reading W: <br />In 5 <br />.,<- L &S <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RT: -U: <br />Pass/Fail Threshold or <br />ass <br />.25!; <br />Comments — fin. -Jude Tformanon on re airs made prior to le-ihyg.,and recommended ,follow-up ,for failed tests) <br />