Laserfiche WebLink
Feb 20 04 09:17a RR DER SINGH 209 41 0142 p_1 <br />SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN _- PAGE 1 <br />TYPE OF ACTION Ed I. NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />M01 <br />PLAN TYPE [2` MONITORING IS IDENTICAL FOR ALL LISTS AT THIS FACILITY. <br />M02. <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION . . <br />FACILITY ID # (Agency Use Only) u (-I;(% <br />FACILITY NAME u� �`. ``i� `,�.y\ ti.] `'.:}. l l `'i' CA\ <br />MOa '' <br />FACILITY SITE ADDRESS/i� ��, 121SGp�,� �i M04.CITY <br />7: / <br />Mos <br />II. EQUIPMENT TESTING AND MVENTIVE MAINTENANCE <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be performed in ' M06. <br />accordance with the equipment manufacturers' instructions, or annually, whichever is more frequent. Such work must be performed by qualified personnel <br />MONITORING EQUIPMENT IS SERVICED. [D;) ANNUALLY ❑ 99. OTHER (Specify): <br />Mol <br />M. MONITORING LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e., location of each sensor, <br />line leak detector, monitoring system control panel, etc.). If you already have a diagram (e.g.. currerd UST Monitoring Site Plan. froma.Monitoring System Certification <br />form, Hazardous Materials Business Plan map, etc.) which shows all required information, include it with this �lan. . <br />IV. TANK MONITORING <br />M_ 0,WORING IS PERFORMED USING THE FOLLOWING METI-IOD(S): (Check all that apply) <br />M10 <br />1. CONTINUOUS ELECTRONIC MONITORING OFTANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAINMENT IS: a. DRY _b. LfQU1D FILLED [I c. UNDER PRESSURE d. DER VACUUM <br />Mt l <br />PANEL MANUFACTURER: Mr" MODEL#: �� � <br />'a 13. <br />LEAK SENSOR MANUFACTURER: M14. MODEL #(S): %. �`S "O �O <br />M13. <br />AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br />PANEL MANUFACTURER: Mr6. MODEL#: <br />nu7. <br />IN -TANK PROBE MANUFACTURER: Mlg. MODEL#(S): <br />M19. i <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />M20 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): Met <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />Er 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />M24 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />5. INTEGRITY TESTING PER 23 CCR <br />�§2,6�43.1 <br />TEST FREQUENCY: b. BIEALLY [Ic. OTHER (Specify): M26 <br />NUALLY ElNNI <br />M27 <br />�Itei'a.. <br />6.VISUALMONITORING DONE: aa, DAILY ❑ b. WEEKLY oteg iresagencyapproval) <br />❑ 99.OTHER (Specify): <br />M28 <br />V. PIPE MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />Mia <br />[9KCONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />M31. <br />PANEL MANUFACTURER: M3= MODEL #: _ �L S <br />ntsa <br />LEAK SENSOR MANUFACTURER: Mia• MODEL #(S): <br />Mss <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? a. YES ❑ b. NO <br />Ms6 <br />WILL FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERAUTOMATIC PUMP SHUTDOWN? ❑ a. YES 01b. NO <br />M37 <br />a''2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED <br />I <br />MLLD MANUFACTURER(s): n>3s. MODEL#(S): <br />3. ELECTRONIC LINE LEAK DETECTOR �E LD) TBIAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS �L �^ r ? s �^ <br />ELLD MANUFACTURER: �% K /% zici % °t'i MODEL #: .? 7 <br />M41 <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />M42 <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES E b( 0 <br />Maa. <br />�/ WILL ELLD FAILURVDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES B' b. NO <br />Q 4. INTEGRITY TESTING <br />/ TEST FREQUENCY: [� NNUALLY El b. EVERY 3 YEARS ❑ c. OTHER (Specify) Mo5. <br />DA1LY <br />Mab <br />[ j 5.VISUAL MONITORING DONE: [�� ❑ b. WEEKLY"` ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED" <br />M47_ <br />" Requires agency approval . "Allowed for monitoring of unburied emergency generator fuel piping only per HSC ¢25281.5(b)(3) <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALI. REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(a)(3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />❑ 99. OTHER (Specify) <br />M48. <br />SJCEHD-d (07/03) -114 07/23/03 <br />