Laserfiche WebLink
' SWRCB, January 2002 Page of <br />5. PIPLNG SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ndustry Standard ❑ Professional Engineer _7 <br />F1 ether /.CnPrih,) <br />Test Method Used: ❑ Pressure ❑ Vacuum ydrostatic <br />0 Other (Sped) <br />Test Equipment Used <br />Equipment Resolution: <br />m on <br />_ r <br />Sump # f Sum # <br />��. p Sump # Sumpe# <br />Sump Diameter: <br />1 <br />Sump Depth: <br />Sump Material: <br />Height from Tank Top to Top of <br />2S <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical <br />Penetration: <br />Cundidon of sump prior to testing: <br />f <br />Portion of Sump Tested' <br />�� <br />Does turbine shut down when <br />sump sensor detects liquid <br />e d <br />0 <br />(both <br />Yes 0 No U, A <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No _ NA <br />❑ Yes ❑ No ❑ NA <br />product and water)?* <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />❑ yes 0 No <br />11 <br />shutdown?" <br />PNTA <br />Yes Yes 0 No ❑ NA <br />Yes 0 No = NA <br />❑ Yes 0 No 0 NA <br />Was fail-safe verified to be <br />n Yes <br />o erationaff <br />0 No A <br />0 Yes ❑ No 0 NA <br />❑ Yes ❑� No = NA <br />0 Yes 0 No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />✓�®R .s[/ <br />(�j✓1 �, i <br />Test Start Time: <br />Initial Reading (Rt): <br />Test End Time: <br />_ <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or Criteria: <br />G v <br />Test Result: <br />ass 0 Fail <br />❑ Pass 0 Fait <br />0 Pass ❑ Fail <br />❑ Pass ❑ Fail J <br />Was sensor removed for testing? <br />=Yes ❑ No = NA <br />❑ Yes ❑ No 0 NA <br />0 Yes ❑ No = NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />_ yes ❑ No - = NA <br />❑ Yes 0 No 0 NA <br />❑ Yes [],No = NA <br />❑ Yes 0 Nn ❑ NA <br />Comments — (inchide information on re airs made prior to testing, and recornameirded folloiv-u for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk C-) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />