Laserfiche WebLink
SWRCB, January 2002 <br />8. SPILL/OVERFILL CONTAINMENT BOXES <br />Page of <br />aci Ly is of quipped With SpiluOvemu Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: _, Spill Bucket -Manufacturer C Industry Standard = Professional Engineer <br />7 � Other (Spec) <br />Test Method Used: _ Pressure L Vacuum Hydrostatic <br />Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution <br />Tae. <br />3�sGil�'f R'a"�. } "i: 1'� e 'aft -L It>i' �;x:�9: Y•T.f:s�.� ¥•—. is -i y <br />Spill Box <br />+�*• �Y•� n>- a�-. P ( Spill Boa # <br />Spill Boz # Spill Boz <br /># <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration.- <br />uration:Change <br />Changein Reading (RF -RI): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />❑ Pass ❑-Fail <br />❑ Pass ❑ Fail <br />❑ Pass ` ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing,and recommended follow-up far failed tests) <br />