Laserfiche WebLink
F. 111 -Tank Gattgiltg / SM F,quiplueut: <br />U c 'Beck this Ihox if Tank ganging is used only for inventory control. <br />U t 'heck this hrix if no tank ganging or SiR equipment is installed. <br />This section must be completed if iii -tank gnuf,inf, equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />FCC33Yyees" <br />s ❑ No*Plaall input wiring been inspected for proper entry and termination, including testing for ground faults? <br />s O No* all lank gauging piohes visually inspected fin cianroge incl residne buildup? <br />s ❑ No*accuracy of system product level readings tested? <br />❑ No*accuracy of systent water level readings tested? <br />FYes ❑ No* Were all probes reinstalled properly'?s ❑ No* Were all iterns on the equipment mannfactnrer's (maintenance checklist completed? <br />* In the Section 11, below, describe how and when these deficiencies evere or will be corrected. <br />G. Line Leak Detectors (i.i,I)): U ('leek this hnx it I.I.I)s rue not installed. <br />es <br />❑ No* <br />For equipment start -tip or intimal equipment certification, was a leak sinudated to verify LLD performance? <br />❑ N/A <br />(Check all that appl)) Simulated leak rale: g p.h , ❑ 0.1 g.p.li ; ❑ 0.2 g.p.h. <br />Were all LLDs confirmed operational -,in(] accurate within regulatory requireriients? <br />O No* <br />es <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />❑ No* <br />For mechanical 1,1,i)s, does the 1.1,1) restrict product flow if it detects a leak? <br />❑ N/A— <br />For electronic L1,1)s does the tnrhine automatically shut off if the 1,1,1) detects a leak? <br />❑ Yes <br />O No* <br />/A <br />❑ Yes <br />❑ No* <br />For electronic I,LDs, dies fire tnthitte automatically shut off if any portion of the monitoring system is disabled <br />UITiA <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic 1,1,1)s, does the turbine autonuctically shut off if any portion of the monitoring system <br />3'1T/_A <br />malfunctions or fails a test', <br />❑ Yes <br />❑ No* <br />For electronic LI,i)s, have all ac-cessible wiring connections been visually inspected? <br />N/A <br />Were apt items on the equipment mini acturer s maintenance checklist completed? <br />Yes <br />❑ No* <br />* In the Section H, below, describe how and when these deficiencies were or will be correcteu. <br />H. Comments: <br />Page 3 of 3 <br />Awl <br />