Laserfiche WebLink
SWRCB,January 2002 <br /> Page � of <br /> 9. SPILIJOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested <br /> Test Method Developed By: f�Spill Bucket Manufacturer j Industry Standard L' Professional Engineer j <br /> C'Other(Spec) <br /> Test Method Used: FJ Pressure ❑ Vacuum CJ Hydrostad-6 <br /> 0,Other(Spec) <br /> Test Equipment Used: Equipmgnt Resolution: <br /> pl, <br /> Spite B®x# Spill Box# / Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading <br /> Test D!raTi n: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail <br /> Com ents—(,include information on re airs madeprior to testing, and recommended ollow-u for ailed rests) <br /> SID <br /> ; i Ott e Y S - ms s, L l 4 w 4 14 �`� i � g � ce, Alan. <br />