Laserfiche WebLink
SAN JOAQUIN COUNTY PUBLIC HEALTH SERVICES -ENVIRONMENTAL HEALTH DIVISION <br />UNDERGROSP STORAGE TANK PROGRAM FOWORKSHEET <br />�I <br />APPLICANT BILLING NAME <br />FACILINAME <br />FACILITY CONTACT NAME <br />( 'I ��/ ilk— <br />APPLICANT MAILING ADDRESS <br />APPLICANT PHONE # WITH AREA CODE <br />-P_O-7j-:a �G <br />FACILITY ADDRESS <br />SITE PHONE # WITH AREA CODE <br />3 <br />0 %c) (c_sa <br />—L/ 3 <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 87 / HOUR <br />CITY <br />STATE <br />ZIP CODE <br /># OF TANKS AT SITE <br />$ <br />CA <br />qs-Z-4 ` <br />APPLICANT BILLING NAME <br />APPLICANT CONTACT NAME <br />-:5TeC_6� J � V t�G-, -,m0 7 AE4. 6a <br />( 'I ��/ ilk— <br />APPLICANT MAILING ADDRESS <br />APPLICANT PHONE # WITH AREA CODE <br />-P_O-7j-:a �G <br />_X333 <br />CITY <br />STATE <br />ZIP CODE <br />CIRCLE WORK TO BE DONE: <br />Closure Installation Repair Retrofit <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 87 / HOUR <br />ACTIVE FACILITY <br />TANK ID # (s): <br />CLOSURE FEE = $261 / TANK <br />1995-1999 <br />2000 <br />TANK ID # (s) : <br />$500 FEE INCLUDES FACILITY FEE + 1 TANK <br />($170) X (# tanks) X (# of years'applicable) <br />PLAN CHECK FEE = $696 / FACILITY <br />$125 PER TANK AFTER FIRST TANK <br />$ <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 87 / HOUR <br />$ <br />SAMPLING INSPECTION FEE = $ 87/ HOUR <br />$ <br />TANK PENALTY ASSESSED <br />TANK SURCHARGE = $8 / TANK <br />$ <br />STATE SURCHARGE FOR FACILITIES NOT ALREADY ON INVENTORY IN A CUPA PROGRAM = $10 / FACILITY <br />PERMANENT CLOSURE <br />Removal or Permitted Closure in Place <br />TANK ID # (s): <br />CLOSURE FEE = $261 / TANK <br />I # TANKS X $261 = <br />TEMPORARY CLOSURE <br />(Plan Review and Inspections) <br />TANK ID # (s) : <br />TEMPORARY CLOSURE FEE = $261 / FACILITY <br />INSTALLATION PLAN CHECK <br />Plan Check and Construction Inspections) <br />TANK LINING REPAIR FEE = $261 / TANK <br /># TANKS X $261 = <br />I <br />TANK RETROFIT REPAIR FEE _ $261 / FACILITY <br />TANK ID # (s) : <br />PLAN CHECK FEE = $696 / FACILITY <br />REPAIR PLAN CHECK <br />TANK ID # (s) : <br />TANK LINING REPAIR FEE = $261 / TANK <br /># TANKS X $261 = <br />TANK RETROFIT REPAIR FEE _ $261 / FACILITY <br />$ <br />- <br />PIPING REPAIR FEE = $261 / FACILITY <br />MISCELLANEOUS <br />$ <br />TRANSFER FEE _ $ 20 <br />$ <br />CONSULTATION FEE = $ 87/ HOUR <br />$ <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 87 / HOUR <br />$ <br />SAMPLING INSPECTION FEE = $ 87/ HOUR <br />ALL FEES ARE BASED ON THE $87 HOURLY RATE. TIME THAT EXCEEDS FEES PAID WILL BE BILLED TO APPLICANT. <br />OFFICE USE ONLY <br />SERVICE REQUEST # FACILITY ID AMOUNT RECEIVED CHECK # RECEIVED BY DATE RECEIVED <br />SR <br />EH 23 032 (REVISED 9-21-001 <br />