My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
437
>
2300 - Underground Storage Tank Program
>
PR0506406
>
COMPLIANCE INFO_1996-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 3:00:08 PM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2008
RECORD_ID
PR0506406
PE
2361
FACILITY_ID
FA0002313
FACILITY_NAME
WILSON WAY CHEVRON
STREET_NUMBER
437
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15113052
CURRENT_STATUS
01
SITE_LOCATION
437 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506406_437 N WILSON_1996-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLATION INSPECTION RECORD <br />FACILITY NAME: m �S F-kX6 / v ADDRESS: �� / l)SA ,L <br />FACILITY ID# TANK# UL#TANK MOOEL/MATERIA <br />CAPACITY: / .:') ^A /-,1) PRODUCT: R.E.H.S: <br />INITIAL INSPECTIONS <br />! <br />A <br />I <br />VACUUM: SOAP: PSI: HRS/MIN: 8(tiNE{LIQUID ANNULAR): OTHER: <br />& _5/` , ;,nuv, <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />SECONDARY PIPING CONTAINMENT TEST PSI: Li <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />15. <br />R <br />T <br />HRS: <br />(CCR 2635 (a) (4)) <br />0 <br />I <br />9. <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />V <br />A <br />� <br />0. <br />E <br />L <br />(CCR 2635 (b) (1) (C)) <br />I- <br />0 <br />S <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />19. <br />(CCR 2636 (b)) <br />/4lI <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />PIPING SLOPES TO COLLECTION SUMP <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2636 (c)(1)) <br />I21. <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br />(CCR 2632 (d)) <br />V114) <br />2. UST INSTALLATION PLANS APPROVED <br />INITIAL INSPECTIONS <br />! <br />V1 <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: 8(tiNE{LIQUID ANNULAR): OTHER: <br />& _5/` , ;,nuv, <br />CCR 2636 (e)) <br />4. PRIMARY TANK TEST: I PSI: 1�4 HRS/MIN: <br />7. <br />SECONDARY PIPING CONTAINMENT TEST PSI: Li <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (APT/PEI) <br />PIPING INSPECTIONS <br />I <br />V1 <br />6. <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) <br />& _5/` , ;,nuv, <br />CCR 2636 (e)) <br />3M �f <br />7. <br />SECONDARY PIPING CONTAINMENT TEST PSI: Li <br />HRS/ IN: OTHER: <br />(CCR 2636 (e)) <br />15. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) <br />HRS: <br />(CCR 2635 (a) (4)) <br />6. <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />9. <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />PEI <br />f ®�IA_ <br />� <br />0. <br />OVERSPILL PERFORMANCE TEST <br />(CCR 2635 (b) (1) (C)) <br />I- <br />(CCR 2635 (b) (2)) <br />1. <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />19. <br />(CCR 2636 (b)) <br />/4lI <br />L�l <br />12. <br />PIPING SLOPES TO COLLECTION SUMP <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2636 (c)(1)) <br />FINAL INSPECTION <br />SH23-006 9/95 T <br />PERFORMANCE TEST FOR "ALL" MONITORING PROBES <br />(CCR 2632 (c) (2)) <br />�1 ai <br />J <br />4. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR 2632 (c) (2)) <br />15. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />(CCR 2643 (c) (1)) <br />y <br />6. <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />(CCR 2636 (9)) <br />b <br />7. <br />BALL FLOAT VALVES INSTALLED <br />8. <br />OVERFILL PROTECTION INSTALLED/APPROVED <br />(CCR 2635 (b) (2)) <br />19. <br />TANK ACCESS PMTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) <br />API <br />20. <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2635 (a) (5)) <br />I21. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />(CCR 2632 (d)) <br />22. <br />"C° FORM COMPLETED AND SUBMITTED <br />(CCR 2635 (d)) <br />�23. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />(CCR 2630-2636) <br />I24. <br />ALL CONDITIONS MET; FACILITY PERMIT ISSUED <br />(H+S CODE 25284) <br />SH23-006 9/95 T <br />
The URL can be used to link to this page
Your browser does not support the video tag.