Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 2 sets of plans&applications as originals will be retained by END) <br /> 1. Site map enclosed YES[] NO(I <br /> 2. Manufacturer's spec sheets attached for all equipment to be installed YES[] NO[] <br /> 3. Description of work to be completed(If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation I' ation pages -8 asn ary for a tipnely plan r 'ew): <br /> 4. Description of equipment to be sed ttach drawin s/blnuts as cessa <br /> 5. All equipment is State certified or approved. YES[] NO[j <br /> 6. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES[] NO[] <br /> b. Identify contractor performing decontamination: <br /> Name Phone(_) <br /> Address city zip <br /> c. Describe method to be used for decontamination: <br /> d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br /> e. Rinisate Hauler and permitted Treatment,Storage&Disposal Facility: <br /> Hauler Name Phone( Hauler Reg# <br /> Address city Zip <br /> Permitted Disposal Site <br /> 7. a. Describe the method that will be utilized to purge and/or inert the piping: <br /> b. Piping Hauler: <br /> Name Phone <br /> Address City Zip <br /> Hauler Registration#(f hauled as hazardous) <br /> c. Piping Disposal Site: <br /> Name Phone <br /> Address City Zip <br /> EPA lD#(if transported to a permitted TSD facility) <br /> 8. Is the sampling firth an independent third party from the contractor? YES[] NO[] <br /> 9. Describe,in detail,how the soil and/or water sample(s)beneath the piping or dispenser will be obtained: <br /> 10. Handling of excavated soil(Contaminated Soil Hazardous Waste Hauler): <br /> Name Hauler Registration# Phone( .. ) <br /> Address City Zip <br /> b) if soil is not to be hauled,describe what will be done with it: <br /> 2 <br />